Saturday, April 19, 2025

Random Update Of An MRO 9-Well Pad In Killdeer Oil Field -- April 19, 2025

Locator: 44846B.

See this post for the daily activity report when first noted.

The permits/wells on that 9-well pad, sited west to east, with four horizontals appearing to run north, and four horizontals running south; it appears a horizontal is yet to be drilled for #40231, but I could be wrong:

  • 17509, runs south (definite), conf, MRO, Nanette Strommen 41-13H, Killdeer,
    • 2023: being re-entered to run sidtrack #2 -- see this post for stunning results.
  • 40288, runs south (?), drl/A, MRO, Bowers 31-13H, Killdeer, t--; cum 174K 2/25;
  • 40290, runs south (?), drl/A, MRO, Grayson 441-13TFH, Killdeer, t--; cum 126K 2/25;
  • 40289, runs south (?), drl/A, MRO, Madsen 41-13H, Killdeer, t--; cum 189K 2/25;
  • 40287, runs north (?), drl/A, MRO, Serum 34-12H, Killdeer, t--; cum 220K 2/25;
  • 40231, north (?), drl/A, MRO, Lillebridge 44-12H, Killdeer, t--; cum 217K 2/25;
  • 40286, runs north (?), drl/A, MRO, Noreen 44-12TFH, Killdeer, t--; cum 207K 2/25;
  • 40285, runs north (?), drl/A, MRO, Muggli 44-12H, Killdeer, t--; cum 225K 2/25;
  • 40284, runs north (?), drl/A, MRO, Kellogg 14-7TFH, Killdeer, t--; cum 222K 2/25/

Maps:


MRO Strommen wells in Killdeer field are tracked here (not sure if all Strommen wells are accounted for).