Showing posts with label CommunicationAcrossFormation. Show all posts
Showing posts with label CommunicationAcrossFormation. Show all posts

Tuesday, February 11, 2020

More On That XTO "POW" Well; Monitoring Communication Between Two Upper Benches Of The Three Forks -- February 11, 2020

The well:
  • 36679, drl, XTO, Mariner 14X-36POW-S, Bear Creek, Three Forks 2B / 1B;
See #18797 at this post. "Equivalent to a new well being drilled."

From the file report, #36679:
  • the purpose of this well is to monitor fracking communication based on proximity to offset wells being fracked
  • this well is strategically landed below the Mariner 14X-36D (#36678), the wellbore traversed from the lower section of the Three Forks second bench to the lower Bakken shale
  • special fiber optic liner was run to monitor fracking communication from the Mariner 14X-36D
  • the Mariner 14X-36POW-H proved the most useful offset well in predicting formation tops
  • data was used to "pin-point" a strategic landing of the subject well;
  • curve successfully landed 28' below the top of the Three Forks second bench
  • reached TD, 16,890' MD on October 10, 2019
  • low gas units throughout the second bench
  • the greatest hydrocarbon shows (C1-C4) preferentially occurred in the more dolomitic horizons of the Three Forks first bench; background gas decreased to an approximate range of 25 - 50  units in the second bench;
  • the objects of drilling the lateral was to create a straight wellbore that traversed from the Three Forks second bench to the Three Forks first bench to be used as an observation well;
  • entry into the Three Forks first bench was noted by a distinguishable claystone at the bottom of the formation; the approach toward the Pronghorn was noted by siltstone and limestone in samples;
  • the vertical, curve, and lateral were drilled in 18 days using seven bottom-hole assemblies;
  • the wellbore was completed 100% within the Three Forks second bench and Three Forks first bench target interval, opening up 4,963' of formation to be used to monitor offset well fracking communication;
  • permit: spacing: 640 acres; section 1-147-96; Three Forks B2;
    • surface hole: SWSW 36-148-96, 108FSL, 187 FWL;
    • bottom hole: SENE 1-147-96; 1530 FNL, 102 FEL;
Graphics:




Saturday, January 13, 2018

The BR Mathistad Wells In Croff Oil Field

Locator: 10010MATHISTAD.
 
Updates

 September 4, 2024: compare today's map with the original map --


January 14, 2018: see first comment. A reader has really made some interesting observations, including a great link.

Just a couple notes of interest:

The lateral for the Mathistad 2-35H runs 50 feet above and parallel to the 1-35H. It was originally owned by Continental Resources and was an experimental well partially funded by the State of North Dakota to determine possible communication between nearby laterals most notably the 1-35H. The details are on the attached link:

https://www.rigzone.com/news/oil_gas/a/79041/Continental_Reports_Successful_TwoReservoir_Test_in_Bakken_Shale

Also, there looks to be room for another 4 well pad between the new and older wells? 
And, then, of course, my reply: yes, there is more than enough room for another 4-well pad between the older well pads, and then, of course, vertically, additional benches in the Three Forks, possibly.

With regard to communication between formations, see this post: http://themilliondollarway.blogspot.com/2010/02/communication-between-formations.html, February 7, 2010.

Also, this post from May 4, 2011.

Also, a "fracturing question," March 3, 2011.


Original Post 

Note production profile of two older Mathistad wells, scroll down to bottom of post. 

The Mathistad wells:
  • 16983, 15 (no typo), BR, Mathistad 1-35H, Croff, API: 33-053-02852, t6/08; cum 321K 11/19; was off line 6/19; returned to production, 9/19; cum 380K 6/24; off line;
  • 18013, 842, BR, Mathistad 2-35H, Croff, API: 33-053-03011, t7/09; cum 281K 11/19; cum 337K 2/24; off line;
  • 33144, 318, BR, Mathistad 22A MBH, Croff, 30 stages; 10.5 million lbs, t10/17; cum 476K 11/19; cum 766K 7/24;
  • 33146, 273, BR, Mathistad 22B UTFH, Croff, 4 sections, Three Forks, 31 stages; 15 million lbs, t10/17; cum 493K 11/19; cum 702K 7/24;
  • 33152, 414, BR, Mathistad 6-8-35 MBH, Croff, 29 stages; 10 million lbs large, t11/17; cum 562K 11/19; cum 791K 7/24;
  • 33150, 655, BR, Mathistad 3NC-MTFH, Cross, 4 sections, Three Forks, 29 stages; 14.5 million lbs, t11/17; cum 466K 11/19; cum 633K 7/24; off line;
  • 33155, 40, BR, Mathistad 7-8-24 MBH,t3/20; cum 381K 7/24;
  • 37580, conf, BR, Mathistad 2A MTFH, no production data,
  • 37578, conf, BR, Mathistad 2B MTFH, no production data,
The graphic:



Recent production for two older wells:
16983:
PoolDateDaysBBLS OilRunsBBLS WaterMCF ProdMCF SoldVent/Flare
BAKKEN11-20171532773289508283928020
BAKKEN10-20171000000
BAKKEN9-20170000000
BAKKEN8-201723894685286155815010
BAKKEN7-20173011361109256197719030
BAKKEN6-20173011561349196192818540
BAKKEN5-2017311132905228211120340


18013:
PoolDateDaysBBLS OilRunsBBLS WaterMCF ProdMCF SoldVent/Flare
BAKKEN1-20181117761638336172817010
BAKKEN12-20172755285169958581457470
BAKKEN11-20171530243084621289928620
BAKKEN10-20170000000
BAKKEN9-20170000000
BAKKEN8-201711411597448478220
BAKKEN7-20173114611350213289728200
BAKKEN6-20173014491597141257324990
BAKKEN5-20173115751586165267525980
BAKKEN4-20172817881576170230522350

16983:
PoolDateDaysBBLS OilRunsBBLS WaterMCF ProdMCF SoldVent/Flare
BAKKEN1-201831600359301024663565580
BAKKEN12-2017316246628016217012687461
BAKKEN11-20171532773289508283928020
BAKKEN10-20171000000
BAKKEN9-20170000000
BAKKEN8-201723894685286155815010
BAKKEN7-20173011361109256197719030
BAKKEN6-20173011561349196192818540

Tuesday, December 26, 2017

Random Update Of Three Whiting/KOG Mandaree Wells -- December 26, 2017

NB: note the names of the two earlier wells; and the name of the re-fracked well.



The wells:
  • 18517, 1,595, Whiting, Two Shields Butte 2-24-12-2H, Mandaree, t9/11; cum 494K 10/17;
  • 19826, 2,945, Whiting, Two Shields Butte 2-24-12-1H3, Mandaree, Three Forks; 9/11; cum 454K 10/17; 10562; well name change from 2-24-12-1H to 2-24-12-1H3;
  • 30929, 1,989, Whiting, Two Shields Butte 1-24-12-1H, Mandaree, 44 stages, 14.6 million lbs, t1/17; cum 210K 10/17; 10476; 

18517, 2-24-12-2H:
BAKKEN10-20173149754937303616771060400
BAKKEN9-201719309431251845843252447
BAKKEN8-20172952425301319118491331295
BAKKEN7-20173164196503463031802629331
BAKKEN6-201730591758524360392723511355
BAKKEN5-201731614161024898527025082454
BAKKEN4-201730557356204750608328063001
BAKKEN3-20173161316028796145154014263
BAKKEN2-2017212451239037672064185392
BAKKEN1-2017002630000
BAKKEN12-20160000000
BAKKEN11-2016302656256111412801217343
BAKKEN10-20163133533454174943183178394
BAKKEN9-2016293920383216972884638165

19826: 2-24-12-1H3:
BAKKEN8-2017313510357579181025705156
BAKKEN7-20173154605578941433542777350
BAKKEN6-201730631062297903587335392039
BAKKEN5-201731606060367924760136373559
BAKKEN4-201730617962278171708232743501
BAKKEN3-20173166756640921350374487294
BAKKEN2-20172857265595737460925564275
BAKKEN1-201753014192191441280
BAKKEN12-20160000000
BAKKEN11-201615130813507695003657


30929, 1-24-12-1H:
PoolDateDaysBBLS OilRunsBBLS WaterMCF ProdMCF SoldVent/Flare
BAKKEN10-2017312005720038950518790124894717
BAKKEN9-2017302141621451100481637752049228
BAKKEN8-20173124001240831151324035180634000
BAKKEN7-2017312060120521878918889160062017
BAKKEN6-201717964997203482853651912991
BAKKEN5-201731169651692882261987795849377
BAKKEN4-20173018717189568904218381018110888
BAKKEN3-20173123713238561093318502167071094
BAKKEN2-20172831180313832785222159204451011
BAKKEN1-20172524057230782463315942157700