Thursday, October 15, 2026

Project Star -- Another Energy -- Data Center For Texas -- South Texas -- Near San Antonio -- October 5, 2026

Locator: 51959PROJECTSTAR.

It looks like I failed to note this on the blog: Project Star. It was not mentioned by name but at her first White House press briefing the new White House press secretary mentioned it.

With minimal information, ChatGPT was able to find the story for me. Link here. Link: https://chatgpt.com/s/t_6ad1a3c2bff88191bf43acbd342d2e42.  

Also see this link for how chatbots work. Link: https://chatgpt.com/s/t_6ad1a7f79858819184eb231487342cf4.  

So, here's AI's synopis of Project Star. Again, for Texas, a huge, huge story. Note where in Texas this new project will be built.

But this is huge: the power plant is 6.5 GW; the data center will use 5 GW. Data centers are typically 1 - 2 GW, with most near the 1-GW threshold, so 6.5 GW caught my attention. 

San Antonio, without question, the real sleeper among the top five Texas cities, and I would argue that San Antonio is the best of the five. If I could choose where I would like to be living in Texas now, it would be San Antonio. 


This is the story in The San Antonio News as reported by Yahoo!Finance, link here:

A trade deal between the U.S. and the Republic of Korea is spurring a $22 billion gas-fired generating plant to power a data center campus in South Texas.

Dubbed Project Star, the plant in Encinal will be operated by NextEra Energy Resources and Related Companies, with San Antonio-based Lewis Energy Group as a partner. NextEra said the project will create about 8,400 construction jobs and 170 permanent jobs at the power plant campus.

The plant in southwest La Salle County will generate 6.47 gigawatts of electricity, enough to power 1.62 million Texas homes on a hot summer day - though few residences will be powered by the project. Instead, it will power the 5-gigawatt data center campus Related Digital is building on an adjacent site, the company said. Any excess energy will be sold to the Texas grid.

More jobs will be generated by the data center campus, which Related Digital said will operate on a closed-loop cooling system, which the company said will keep the operation's daily water consumption comparable to that of a standard office building.

TGIF -- Friday Morning, October 16, 2026

Locator: 51958B.

Pageviews: after a recent "slowdown," the blog is back to 200,000 pageviews/24 hours and has now crossed 115 million pageviews. We crossed one hundred million pageviews back in mid-September. An increase of 5 million pageviews in one month. For the archives.  

NFL tonight: what a wild finish for the Broncos to come back and win, defeating the Seattle Seahawks in overtime,  

Baseball: holy mackerel! The Milwaukee Brewers sweep the Dodgers to return to the World Series, first time for them since 1982. That's 44 years ago; Ronald Reagan was in his second year as president. The Brewers were down 4 - 0 at the end of the second inning, coming back to win 6 - 4. 

*******************************
Back to the Bakken 

WTI: $97.34 --> $98.23 overnight. Closer to $100 than $90. And most of us would be happy with $80 oil. Years ago, $60 was the goldilocks price -- good for investors and good for consumers at the pump. 

CVX: could gain $1.43 at the open.  

New wells reporting: 

  • Sunday, October 18, 2026: 47 for the month, 47 for the quarter, 546 for the year,  
    • 42227, conf, Whiting, Paulson 5104 44-13 4B,
    • 42139, conf, XTO, GBU Sophia Federal 44X- 10B-S,
    • 41471, conf, Enerplus, Crying Tree 147-97-8-5-4H, 
  • Saturday, October 17, 2026: 44 for the month, 44 for the quarter, 543 for the year, 
    • 42138, conf, XTO, GBU Sophia Federal 44X-10E-S, 
    • 42137, conf, XTO, GBU Sophia Federal 44X-10A-S,
    • 41921, conf, Hess, GO-Lemire-157-97-3613H-1, 
    • 41470, conf, Enerplus, Crying Tree 147-97-8-5-3H, 
    • 41160, conf, Silver Hill, Christine 158-93-9-4-20MBH, 
    • 35767, conf, Silver Hill, LTM 158-93-10-3-1MBH, 
    • 35766, conf, Silver Hill, Christine 158-93-9-4-4MBH,  
  • Friday, October 16, 2026: 37 for the month, 37 for the quarter, 536 for the year,  
    • 42564, conf, XTO, GBU Sophia Federal 44X-10F-N, 

RBN Energy: Are we building enough gas pipeline capacity east out of Katy? Link here. Archived.

The volumes of Permian natural gas flowing into the Katy area west of Houston will be increasing sharply over the next few years, as will gas demand from new and expanding LNG export terminals near the Texas/Louisiana border. 

Three new pipelines with a combined capacity of 8 Bcf/d — Blackfin, Trident and Mustang Express — are being developed to move gas from Katy to the state line, but will that be enough? 

In today’s blog, we’ll use RBN’s Arrow Model to assess Enbridge’s recently unveiled proposal to add up to 2 Bcf/d of incremental capacity from Katy to the Gillis Hub in southwestern Louisiana. Exactly where SpaceX is building out a huge complex. 

We have blogged extensively over the past few years about three critically important and intertwined topics: fast-rising production of associated gas in the Permian, the massive buildout of new LNG export capacity along the Gulf Coast, and the frenetic development of gas pipeline capacity from Permian wells to water. Much of the discussion has focused on takeaway pipelines out of West Texas to the Agua Dulce Hub in South Texas and the Katy Hub — most recently, we looked at the record-busting plan by a WhiteWater Midstream-led consortium to build the 4.5-Bcf/d Solitude Pipeline, which will consist of twin 48-inch-diameter pipes from the Waha Hub to the Katy area.

But getting Permian gas to inland hubs like Katy and Agua Dulce — or to the Dallas/Fort Worth area, like Energy Transfer’s Hugh Brinson Pipeline — addresses only part of the challenge. The other part is, how do you get gas from there to where it’s demanded most, namely to LNG export terminals along the Gulf Coast between Port Arthur, TX, and Cameron Parish in the southwestern corner of Louisiana. Within that 40-mile stretch, about 59 MMtpa (~6.7 Bcf/d) of LNG export capacity is in operation and another 86 MMtpa (~9.4 Bcf/d) has reached a final investment decision (FID) and is either under construction or will be soon.

Sure, a sizable portion of that gas demand from existing and planned LNG export terminals will be met by the Haynesville Shale in northwestern Louisiana and northeastern Texas, but while Haynesville gas is produced at a relatively high cost, gas from the Permian is produced as a no-cost byproduct of crude oil-focused drilling and needs to find a home.

Midstream developers have been working hard the past couple of years to advance pipeline projects to transport more gas from the Katy area to Port Arthur and beyond. For example:

  • A joint venture of WhiteWater Midstream and LNG exporter Venture Global is building the 3.5-Bcf/d Blackfin Pipeline (dashed purple line in Figure 1 below) from Colorado County, TX, (just west of Katy) to Jasper County, TX, near the Texas/Louisiana line. Blackfin is slated to start up in Q4 2026 or Q1 2027. It will connect in Jasper County with CP Express (dashed orange line), a 2.2-Bcf/d interstate line being built to supply feedgas to the CP2 LNG facility just across the border in Cameron Parish.
  • Kinder Morgan is constructing the 2-Bcf/d Trident Pipeline (dashed dark-red line) from Katy to the Port Arthur area; it expects to finish Phase 1 (1.5 Bcf/d) in Q1 2027 and a 500-MMcf/d expansion (Phase 2) in Q4 2028.
  • ARM Energy and PIMCO are jointly developing the 2.5-Bcf/d Mustang Express pipeline (dashed blue line), which by late 2029 or early 2030 will move gas from just west of Katy to the Port Arthur area.

Extended Family Member -- New Worksite -- Gresham (Portland), Oregon -- October 15, 2026

Locator: 51957FAMILYNEWS.

EOG With Four New Permits -- October 15, 2026

Locator: 51956B.

Bend, Oregon: thank goodness "we" haven't banned guns altogether. By the time local law enforcement arrived, already two fatalities and multiple injuries. 

**************************************
Back to the Bakken
 

WTI: $97.64. Close to $100 than $90. 

Active rigs: 36. Back to its recent high.

Four new permits, #43411 - #43414, inclusive:

  • Operator: EOG
  • Field: Alger (Dunn County)
  • Comments:
  • EOG has permits for four Ross permits, lot 3, section 5-156-92, to be sited 360 FNL and 1535 / 1685 FWL.  

CUDA Update -- October 15, 2026

Locator: 51955CUDA.

WTI: $93.94 Wednesday night --> $96.60 Thursday morning --> $97.98 Thursday midday.

 *******************************
CUDA

We've discussed CUDA at length. 

Intel:MSFT (1980s)::Nvidia:CUDA (2020s) with one important difference. 

Link here. 

What this means and where we are headed: link here.

***************************
META's Muse Has An AI Advantage That Anthropic Can't Replicate

That was a Yahoo/Finance headline today.

My discussion with Gemini on that issue, link here. Link: https://share.google/aimode/D7zJpHZggMlvuxVIs. 

META: knows your social universe -- your friends, your teachers, where you dine, etc. -- through one app -- Facebook. If I used Facebook, META would know my social universe. I have a Facebook account but seldom use it. 

MSFT: knows your business universe -- through one app -- Linked In.

GOOG: knows much of your viewing universe -- through one app -- YouTube. The streaming networks, other than YouTube -- like Hulu/Disney; Peacock; Skydance -- know the rest of your viewing history -- movies, sports, etc.

Schwab and other brokerages: know your financial universe.

Apple / Siri: must know a heck of a lot about me, but seems very, very afraid to use that information. Homeview is a very, very slow start. Even driving in my car, Siri seldom talks to me. She finds an answer and then shows it on my screen while I'm driving. 

Having read what the Muse app collects even if I never access the app but have it downloaded on my iPhone, I have now deleted the Muse App from my iPhone. I did not just remove the icon, I deleted the app entirely. Link here to what META Muse continues to collect even if I have never used Muse. 

SPR Update -- October 15, 2026

Locator: 51954SPR.

WTI: up $2.52; up 2.65%; trading at $97.61. WTI is now closer to $100 than $90. Just saying. The integrated oil companies are slipping significantly along with the rest of the market. 

SPR. 

SPR inventory level: 

The reserve is holding steady at 283 million barrels. This is the lowest inventory level since October 1982, driven by a massive 172-million-barrel emergency drawdown launched earlier this year to stabilize markets following global geopolitical conflicts. 
Prior to that, the largest announced release: 
The largest Strategic Petroleum Reserve (SPR) release under President Joe Biden was an announced 180 million barrels of crude oil in response to Russia's invasion of Ukraine.

TSMC Sixth Consecutive Quarter Of Record Earnings -- October 15, 2026

Locator: 51953AIREVOLUTION.

This follows the spectacular results of ASML. Link here. 

This is TSMC. 

Six quarters takes us back to early 2025.  

Net income:

  • projected: T$746.3 billion (~ $23.4 billion) 
  • actual: T$763.06 billion (~$23.59 billion)

Market cap for comparison:

  • Ford (F): $50 billion
  • General Motors (GM): $75 billion

TSMC's annual net income (one year) = exceeds market cap of GM. 

Is anyone even paying attention?

The AI revolution broke out in 2022. And here we are growth y/y in double figures. And not just low double figures but 50% to 70% growth, year-over-year.


 


 


Earnings: 

**************************
Previously Posted -- Prior To Earnings Report

Locator: 51931TSMC.


 TSMC's CAPEX in US dollars for calendar year 2026:

Reminder: need to confirm but I recall that Apple's operating cash flow is $54 billion; Apple's CAPEX is $2 billion. Compare that with TSMC above.

Market caps and P/Es:

  • TSMC: $2 trillion / 32;
  • AAPL: $5 trillion / 39.

********************************
Disclaimer

Briefly: 

  • I am inappropriately exuberant about the Bakken and I am often well out front of my headlights. I am often appropriately accused of hyperbole when it comes to the Bakken.
  • I am inappropriately exuberant about the US economy and the US market.
  • I am also inappropriately exuberant about all things Apple.
  • See disclaimer. This is not an investment site. 
  • Disclaimer: this is not an investment site. Do not make any investment, financial, job, career, travel, or relationship decisions based on what you read here or think you may have read here. All my posts are done quickly: there will be content and typographical errors. If something appears wrong, it probably is. Feel free to fact check everything.
  • If anything on any of my posts is important to you, go to the source. If/when I find typographical / content errors, I will correct them. 
  • Reminder: I am inappropriately exuberant about the Bakken, US economy, and the US market.
  • I am also inappropriately exuberant about all things Apple. 
  • And now, Nvidia, also. I am also inappropriately exuberant about all things Nvidia. Nvidia is a metonym for AI and/or the sixth industrial revolution. 
  • I've now added Broadcom to the disclaimer. I am also inappropriately exuberant about all things Broadcom. Now, I've added Amazon. And QCOM. Nothing on this site should be seen as recommendations for the general public. On the other hand, I have no problem if members of my extended family "see" recommendations I might be making - but only members of my extended family, limited to my children and my grandchildren.
  • Longer version here.
  • Thursday Morning, Part 2 -- October 15, 2026

    Locator: 51952INVESTING.

    NFL: TNF -- Seattle Seahawks at Denver Broncos. Seahawks favored by 2.5 points.  

    AAPL: trading up 0.67%; up $2.29 today; trading at $345.24. 

    TTE: eyes massive profit windfall as refining margins soar. Link here to Tsvetana Paraskova.  

    Copper shortage? Link here to Charles Kennedy. 

    Paducah: DOE announces landmark massive tech innovation campus in western Kentucky. Link here.

    • $100-billion private investment (previous such announcements have led to dismal results)
      • phased buildout targeted for 2032
      • Brookfield Asset management will build the data center campus
      • NextEra Energy will be responsible for providing the power
      • the campus: a massive 1.8-GW artificial intelligence and high-performance computing (HPC) innovation campus
    • footprint 
      • 600 acres for the data center
      • 200 acres for 2-GW power center
      • 300 acres for the 2.6-MW battery energy storage
      • total leased / designated area: 785 acres of federal land 
    • power: a new energy infrastructure
      • 2 GW of natural gas-fired generation coupled with 2.6 GW of battery energy storage
    • specific location
      • to be located at the former US DOE Paducah Gaseous Diffusion Plant
      • 5501 Hobbs Road, Kevil, McCracken County, western Kentucky 

    Paducah, Kentucky: I don't know if I would have posted this note but years ago I spent a fair amount of time on the memoirs of US Grant -- I've read it at least twice and parts of it many more times. 

    I also made a self-teaching guide for middle-school students. I will send it to our grandsons in Portland, OR, when they are a bit older. The best part of the self-teaching guide: it teaches a lot of US geography. The memoir had a strong connection to Mark Twain, but that's another story of another day. 

    ********************************
    A Musical Interlude
     
    This takes me back to both the Greek Theater within Griffith Park and the Hollywood Bowl a bit farther to the west. North Hollywood; Los Feliz (wow); North Vermont Avenue; Highland Avenue. 
     
    "Gypsy" by Fleetwood Mac.
     

    Deeper Look At The Bakken East Pipeline -- RBN Energy -- October 15, 2026

    Locator: 51951B.

    Reminder. Previously posted. The full blog is available for a few days without a paywall. Link here.

    Locator: 51940B.

    RBN Energy: will a newly sanctioned pipeline give the Bakken a big surplus of gas takeaway? Link here. Archived.

    The developer of a planned natural gas pipeline across North Dakota has reached a final investment decision (FID) after securing long-term, demand-side commitments for almost all its 1.4 Bcf/d of capacity. The question is, with crude oil-focused drilling activity in the Bakken flat despite elevated WTI prices, will WBI Energy’s roughly $3 billion Bakken East Pipeline leave the play with way too much gas takeaway space? In today’s RBN blog, we’ll discuss the pipeline project, the financial support the state of North Dakota is providing, and the conflicting forecasts for crude oil and associated gas production in the Bakken.

    Over the past 15 years we’ve written frequently about the ongoing need to build more midstream infrastructure to serve Bakken production. Crude oil gathering systems and takeaway pipelines. Crude-by-rail terminals. Gas gathering systems and gas processing plants. And, most recently, natural gas and NGL pipelines. Why? Because while Bakken oil production has been holding steady at about 1.2 MMb/d — well below the play’s 1.5-MMb/d peak in 2019 — a fast-rising gas-to-oil ratio (GOR) has increased the volumes of NGLs-rich associated gas being produced. (More on Bakken GORs and the play’s gas production outlook in a moment.)

    The Bakken East Pipeline Project

    We covered the NGL-pipeline angle in July 2025’s Two Gunslingers. That same month we told the gas-pipeline story in Torn Between Two (Pipelines), which focused on competing proposals by WBI Energy (the Bakken East Pipeline) and a combo of Intensity Infrastructure Partners and Rainbow Energy Center (the Intensity Pipeline) to develop new gas takeaway capacity from the Bakken production region in western North Dakota to the Fargo area at the eastern edge of the state.

    In a twist we discussed in that blog, the North Dakota Industrial Commission (NDIC) — eager to encourage more in-state use of the Bakken’s gas bounty — undertook a competitive evaluation process to determine which pipeline proposal would receive up to $500 million in state support via a 10-year, $50 million/year commitment for about 150 MMcf/d of capacity on the new pipe.

    The three-member NDIC, comprised of the state’s governor, attorney general and agriculture commissioner, in August 2025 unanimously picked WBI Energy’s two-phase, 343-mile Bakken East proposal (dashed pink and red lines in Figure 1 below), citing the company’s experience in developing and operating gas pipelines and the financial strength of WBI’s corporate parent, Bismarck, ND-based MDU Resources, which also owns four electric and/or gas utilities from Minnesota to Washington state. In addition, the commission determined that WBI was more likely to secure the commercial commitments needed to make the project a “go.”