Active rigs:
$60.43 | 7/10/2019 | 07/10/2018 | 07/10/2017 | 07/10/2016 | 07/10/2015 |
---|---|---|---|---|---|
Active Rigs | 58 | 66 | 57 | 29 | 73 |
Fifteen new permits (#36705 - #36710, inclusive):
- Operators: Bruin (10): Hess (5)
- Fields: Eagle Nest (Dunn); Beaver Lodge (Williams)
- Comments:
- Bruin has permits for a 6-well Fort Berthold pad in lot 4/section 19-148-94, Eagle Nest oil field
- Bruin has permits for a 4-well Fort Berthold pad in section 19-148-94, Eagle Nest oil field
- my hunch is this is one big 10-well pad
- Hess has permits for a 5-well BL-Amelia pad in section 15-156-95, Beaver Lodge oil field
- 32163, 1,812, Hess, CA-Anderson Smith-155-96-2635H-5, Capa, t3/19; cum 66K 5/19 (less than three months); a six-well pad; frack data not yet available; [neighboring: #16083, back on line; #16480, a long way to the east, is IA, and offline since 12/18];
- spud: October 27, 2018
- TD: November 4, 2018 (seven days, spud to TD)
- middle Bakken
- vertical drilled in two runs with a planned bit trip at 7,402 feet
- curve: began October 30 at 3:44 a.m.
- curve landed at 4:02 p.m., same day, October 30; twelve hours to drill the curve
- lateral began on November 1
- ceased drilling, November 4, 2018, at 3:55 p.m. CT
- finished 16.69' low of the target center-line and estimated to be out of the bottom of the geologic zone of interest
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.