Wednesday, May 29, 2019

Permian Pipeline Projects -- 3.5 Million BOPD To Be Added In 2019 -- May 29, 2019

The link for the graphic below is at this post.

From twitter today. This is simply amazing. New pipeline capacity for the Permian -- to put this in perspective, I believe the Keystone XL killed by President Obama would have brought 800,000 bopd from Canada to the US:


The projects:
  • Gray Oak Pipeline -- Aneavor, Phillips 66 (note misspelling of "GRAY" in the tweet)
  • Cactus II Pipeline -- Plains All American
  • EPIC Crude Pipeline -- EPIC Pipeline
  • Bayou Bridge Pipeline phase 2 -- Energy Transfer, Plains All American
  • Matador Pipeline -- Anadarko, Magellan, Plains All American
  • Seminole Red Pipeline conversion --Enterprise Products Partners
  • Red Wolf Crude Connector -- Wolf Midstream
  • Gray Wolf Crude Connector -- Wolf Midstream
  • Seaway Pipeline expansion 2 -- Enbridge, Enterprise Products Partners
  • Iron Horse Pipeline -- Tallgrass Energy, Silver Creek Midstream
  • Midland-to-Sealy pipeline expansion --Enterprise Products Partners
  • I believe RBN Energy has discussed many of these in detail.
*********************************
Breakfast At Tiffany's? Nope, At TutorTime