From an earlier post:
From a May 31, 2016, sundry report, for:So, how did the re-frack go? From FracFocus, re-fracked: 4/28/17 - 5/19/17 --
- 17089, 400, CLR, Bridger 44-14H, Rattlesnake Point, open hole frack with 1 million lbs sand, t4/08; cum 134K 4/16;
CLR plans to re-enter and deepen the existing lateral of the Bridger 44-14H. CLR plans to extend the existing lateral by 336' to a TVD of 11,090' and a MD of 21,194' to the proposed BHL (200' FNL, 1320' FEL). After drilling to the proposed BHL, CLR plans to set a liner top packer in the 7" casing at 10,634' MD and then cement the 4.5" 11.6 ppf production liner in place.
CLR will not be injecting diesel fuel during our hydraulic stimulation activities.
- 17089, conf, CLR, Bridger 44-14H, Rattlesnake Point,
Pool | Date | Days | BBLS Oil | Runs | BBLS Water | MCF Prod | MCF Sold | Vent/Flare |
---|---|---|---|---|---|---|---|---|
BAKKEN | 8-2017 | 31 | 27510 | 27488 | 27427 | 28501 | 21738 | 6763 |
BAKKEN | 7-2017 | 5 | 2102 | 2047 | 837 | 1178 | 85 | 1093 |
BAKKEN | 6-2017 | 1 | 519 | 230 | 1306 | 317 | 0 | 317 |
BAKKEN | 5-2017 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BAKKEN | 4-2017 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BAKKEN | 3-2017 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BAKKEN | 2-2017 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BAKKEN | 1-2017 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BAKKEN | 12-2016 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BAKKEN | 11-2016 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BAKKEN | 10-2016 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BAKKEN | 9-2016 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BAKKEN | 8-2016 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BAKKEN | 7-2016 | 6 | 335 | 644 | 87 | 433 | 66 | 367 |
BAKKEN | 6-2016 | 30 | 2106 | 2220 | 602 | 2532 | 159 | 2373 |
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.