I've posted many times about the incredible Bailey oil field. I'm convinced MRO has a vice-president of operations whose only job is to manage this field. My hunch: an intern, recent engineering graduate from UND.
See this post, plus another one that was started late last night and is still in progress.
*******************************
Damn The Torpedoes -- Full Speed Ahead
Active rigs: daily active rigs being reported by NDIC -- 32 -- I did not check the list for duplicates; one is a SWD well;
$70.86 | 12/17/2021 | 12/17/2020 | 12/17/2019 | 12/17/2018 | 12/17/2017 |
---|---|---|---|---|---|
Active Rigs | 31 | 14 | 52 | 68 | 53 |
Seven new permits, #38704 - #38710, inclusive
- Operator: MRO:
- Field: Bailey (Dunn)
- Comments:
- MRO has permits for a seven-well pad, on NENW 17-146-93, all of them to be sited 450 FNL and then between 2236 FWL and 1996 FWL -- that's forty feet between each well;
- the permits: Alvin, Arelia, Sease, KB, Rixman, Comstock, and Yockim
Although we don't have scout ticket data for these new permits, based on their location it is likely they will run north and in the 1280-acre drilling unit: sections 5/8-146-93.
There are currently two parent wells in this drilling unit, #16729 to the east, and #18384 to the west.
The wells:
- 16729, 348, MRO, Vihon 44-8H, Bailey, SESE 8-146-93, 33-025-00647, t11/07; cum 393K 10/21; production jump in 2012; the well originally drilled back in 2007;
BAKKEN | 11-2012 | 30 | 11190 | 11629 | 3793 | 3898 | 3152 | 570 |
BAKKEN | 10-2012 | 11 | 2487 | 1678 | 298 | 364 | 107 | 204 |
BAKKEN | 9-2012 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BAKKEN | 8-2012 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BAKKEN | 7-2012 | 1 | 1 | 0 | 0 | 0 | 0 | 0 |
BAKKEN | 6-2012 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BAKKEN | 5-2012 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BAKKEN | 4-2012 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BAKKEN | 3-2012 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BAKKEN | 2-2012 | 1 | 0 | 0 | 0 | 3 | 3 | 0 |
BAKKEN | 1-2012 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BAKKEN | 12-2011 | 7 | 209 | 475 | 27 | 165 | 129 | 5 |
BAKKEN | 11-2011 | 30 | 1203 | 1160 | 232 | 907 | 690 | 37 |
BAKKEN | 10-2011 | 31 | 1264 | 1138 | 262 | 955 | 720 | 52 |
BAKKEN | 9-2011 | 30 | 1246 | 1400 | 283 | 953 | 680 | 93 |
- 18384, 394, MRO, Glenn Eckelberg 24-8H, Bailey, SESW 8-146-93, 33-025-00990, t5/10; cum 487K 10/21; production jump in 2014; the well originally drilled back in 2010;
BAKKEN | 11-2014 | 30 | 13026 | 13128 | 6472 | 7391 | 293 | 5525 |
BAKKEN | 10-2014 | 27 | 11742 | 11706 | 6005 | 6611 | 1546 | 3654 |
BAKKEN | 9-2014 | 30 | 12466 | 12511 | 5669 | 7290 | 4242 | 1535 |
BAKKEN | 8-2014 | 25 | 15129 | 14799 | 3964 | 9165 | 4708 | 2691 |
BAKKEN | 7-2014 | 1 | 1 | 0 | 0 | 0 | 0 | 0 |
BAKKEN | 6-2014 | 27 | 1029 | 1144 | 846 | 715 | 43 | 421 |
BAKKEN | 5-2014 | 31 | 1304 | 1376 | 837 | 927 | 428 | 173 |
BAKKEN | 4-2014 | 30 | 1304 | 1400 | 837 | 949 | 493 | 137 |
BAKKEN | 3-2014 | 31 | 1395 | 1177 | 866 | 1001 | 563 | 103 |
BAKKEN | 2-2014 | 28 | 1222 | 1181 | 767 | 853 | 421 | 133 |
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.