Friday, September 18, 2020

Slawson's Genesis / Genekat Federal / Loon Federal Wells In Big Bend -- September 18, 2020

From today: six new permits, #37848 - #37853, inclusive --

  • Operator: Slawson
  • Field: Big Bend (Mountrail)
  • Comments:
    • Slawson has permits for a six-well Genesis/Genekat Federal/Loon Federal pad in NWNE 24-152-92, 350' FNL and about 1800' FEL; Big Bend oil field;
    • back on June 16, 2020, Slawson had these new permits, also for Genesis/Genekat Federal:
      • Slawson has permits for three Genesis/Genekat Federal/Genekat Federal wells in SWSW 13-152-92:
        • Genesis 1 SLH, SWSW 13-152-92, 256' FSl 1251' FWL,
        • Genekat Federal (sic) 4-13-12TFH, SWSW 13-152-92, 256' FSL 1276' FWL,
        • Genekat Federal (six) 5-13-12TFH, SWSW 13-152-92, 256' FSL 1326' FWL

Producing wells in the immediate area:

  • 19486, 776, Slawson, Genesis 2-13H, Van Hook, t5/11; cum 301K 3/20; intermittent production beginning 4/20; only two days production, 7/20;
  • 19485, 880, Slawson, Loon Federal 1-24-25H, Van Hook, t5/11; cum 621K 3/20; intermittent production beginning 4/20; only one day production, 7/20;
  • 18188, IA/1,106, Slawson, Genesis 1-13H, Van Hook, F, t9/09; cum 280K 3/20; intermittent production beginning 4/20; only one day production, 7/20;
  • 27493, IA/336, Slawson, Tempest 3-14H, Big Bend, F, t3/14; cum 146K 1/20; intermittent production since 2/20; no production, 3/20 - 7/20;
  • 18119, IA/1,274, Slawson, Tempest 1-14H, Big Bend, F, t10/09; cum 318K 1/20; intermittent production since 2/20; no production, 3/20 - 7/20;
  • 19916, IA/486, Slawson, Orca Federal 1-23-26H, Big Bend, F, t7/11; cum 431K 2/10; intermittent production since 2/20; no production, 3/20 - 7/20;

It appears the wells drilled north into section14, will be short laterals, whereas the wells drilled south, under the river, will be the "standard" two-mile long laterals. Sections 13/14-152-92 are both spaced at 640 and have only short laterals in them. However, sections 13/14 are also combined as a 1280-acre drilling unit, but long laterals  would run east-west, when most producing wells in this area run north/south. 



No comments:

Post a Comment