Friday, January 10, 2020

A Half Million Bbls In Less Than Two Years -- MRO's Winona Three Forks Second Bench -- January 10, 2020

Updates

January 18, 2020: in the graphics below it appeared that the MRO Daniel USA well, #36221, was offset from the main mega-pad. That has been corrected. All wells are part of a huge 10-well mega-pad.


Original Post 

This well was first mentioned here. Note: this is a Three Forks second bench well.

This well is on a nine-well pad. Five of the wells have been drilled and are producing; four more wells yet to be drilled; rig on site (1/2020); and a tenth well in the immediate area, also on "drl" status. This is an incredible pad.



While waiting we can take another look at this staggering MRO well:
  • #33412, 6,509, MRO, Winona USA 21-2TFH-2B, Antelope oil field, t4/18; cum 465K 7/19, Three Forks B2; 45 stages; 10 million lbs, 73,742 bbls + 100,353 mcf (16,722 boe) = 90,465 bod in less than four months; t4/18; cum 510K 11/19:
Production profile:
PoolDateDaysBBLS OilRunsBBLS WaterMCF ProdMCF SoldVent/Flare
SANISH11-201930107101084349922798927013119
SANISH10-201931120751199252483299230105581
SANISH9-201930108941089350693148728751602
SANISH8-2019311215612212589430725246863790
SANISH7-20193112641125076543321681626713425
SANISH6-2019301304013038668436202234909919
SANISH5-2019311561215689787837616250509789
SANISH4-20193021089208811065730332219575490
SANISH3-20191693099359398017386134422461
SANISH2-20192815277153386884275241472910738
SANISH1-20193122348223428488404772645111137
SANISH12-2018292435724159810634275275993824
SANISH11-201895692586926671162280372768
SANISH10-201831237902378216121467643289710770
SANISH9-201830289072898213617556302889523478
SANISH8-201831345453460816623555682105832353
SANISH7-201831429924307320637587821730438864
SANISH6-201830638546399225526867561391768246
SANISH5-201829572925744931612691113890826595
SANISH4-201823737427309947011003533064561613
SANISH3-201823042950128615892

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.