Wednesday, July 11, 2018

Random Look At An Early BR CCU Bison Point Well In Corral Creek -- July 11, 2018

This well was originally fracked back in 2008, open hole, with relatively small amount of water and 1 million pounds of sand, and then re-fracked in 2016.

The well:
  • 17106, 361, BR, CCU Bison Point 14-34H, Corral Creek, t7/08; cum 193K 5/18; second re-frack, t2/14/2017, with an IP of 672, 26 stages; 5 million lbs sand (mesh and large);
The well has a very strange production profile but due to all the activity (drilling and fracking) in the area, it makes sense.

The production profile since 2015 (the best monthly production after the initial frack was 5,156 bbls, back in 7/2008:
PoolDateDaysBBLS OilRunsBBLS WaterMCF ProdMCF SoldVent/Flare
BAKKEN5-20183131363100384624051656746
BAKKEN4-20182222642246246417281020707
BAKKEN3-201815729716633728239489
BAKKEN2-20180000000
BAKKEN1-20181000000
BAKKEN12-20170000000
BAKKEN11-20171003000
BAKKEN10-2017001360000
BAKKEN9-20171480017961545355204627885
BAKKEN8-20177443643404081360836030
BAKKEN7-2017002980000
BAKKEN6-20172822597224771821918522185090
BAKKEN5-2017151213711959113181031482032107
BAKKEN4-201772422242261700
BAKKEN3-20170000000
BAKKEN2-2017353531700
BAKKEN1-20170000000
BAKKEN12-20160000000
BAKKEN11-20160000000
BAKKEN10-20160000000
BAKKEN9-20160000000
BAKKEN8-20160000000
BAKKEN7-20160000000
BAKKEN6-20160000000
BAKKEN5-20160000000
BAKKEN4-20160000000
BAKKEN3-20160000000
BAKKEN2-20160000000
BAKKEN1-20160000000
BAKKEN12-20150000000
BAKKEN11-20150000000
BAKKEN10-20150000000
BAKKEN9-2015102150200
BAKKEN8-201531119811151517550677
BAKKEN7-201531132113441536280551
BAKKEN6-20153019231953150118601111
BAKKEN5-20153575412503500342
BAKKEN4-20151510651090586710634

The area as it looks today:


No comments:

Post a Comment

Note: Only a member of this blog may post a comment.