Wednesday, August 23, 2017

Random Note On Two Wells In The Bakken -- August 23, 2017 -- Huge Production Reporting Error In This Post

Updates

September 14, 2017: huge, huge reporting error for #17106. See this post

Original Post
Note #16180 at the very bottom of the post. This well was re-fracked.

About two weeks ago, I posted this:

Here's the monthly production data for the past 12 months for this well: DISREGARD -- the 90,038 was a typographical error or reporting error by the NDIC. See the September 14, 2017, update linked above.
  • 17106, 361, BR, CCU Bison Point 14-34H, Corral Creek, t7/08; cum 241K 6/17
PoolDateDaysBBLS OilRunsBBLS WaterMCF ProdMCF SoldVent/Flare
BAKKEN6-20172890038890271821918558185450
BAKKEN5-2017151213711959113181031482032107
BAKKEN4-201772422242261700

It looks "real," but I suppose there could be an error to explain a monthly production to 90,000 bbls of oil from an on-shore well in North America, but for now it is what it is.

Today, Marathon reports the results of a completed DUC in Chimney Butte:
  • 33247, 2,774, MRO, Mittelstadt 34-12H, Chimney Butte, t6/17; cum 75K 6/17; as of 8/17, the 70,261 production number has not been changed:
PoolDateDaysBBLS OilRunsBBLS WaterMCF ProdMCF SoldVent/Flare
BAKKEN6-20173070261700396838750603606031225
BAKKEN5-20176468942230414504114

I  have a link at the sidebar at the right for Bakken wells that have produced 50,000 bbls of crude oil or more in a single month, but 70,000 and 90,000 -- if these numbers hold -- and there may be errors -- this is simply staggering.

If these numbers are accurate, and if they results are reproducible based on Bakken 2.0 parameters, this begins a whole new chapter in the Bakken.

The location of the MRO Mittlestadt well is noted in this graphic:



Chimney Butte oil field has had an incredible increase (on a percentage basis) in crude oil production.  For links to other recent production data by field, go to this link.




Notice the nice bump in production in this neighboring well:
  • 16180, 128, MRO, Marlin 24-12H, Chimney Butte, t8/06; cum 258K 6/17; it turns out this well was refracked, 4/17; 14 stages; 2.8 million lbs;
Recent production profile:
PoolDateDaysBBLS OilRunsBBLS WaterMCF ProdMCF SoldVent/Flare
BAKKEN6-2017196679712011847607828632480
BAKKEN5-20177509645900468804113
BAKKEN4-20170000000
BAKKEN3-20170000000
BAKKEN2-201700320000
BAKKEN1-20174116460917412315
BAKKEN12-201631100610271301130837103
BAKKEN11-2016301102959130120599023
BAKKEN10-20163111589941391321103586

Production after original completion:
BAKKEN2-200723313728412556221222120
BAKKEN1-2007263040286242728372402597
BAKKEN12-20063144604421642415204152
BAKKEN11-20063051655423773509105091
BAKKEN10-200631797881101324758607586
BAKKEN9-200628791980311770870408704
BAKKEN8-200617229817611240177701777
BAKKEN7-20069134010690137001370

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.