Samson O&G advised that the Rodney #1-14H has been turned to production following the successful fracture stimulation and completion. The work over rig was released on June 25th after all of the fracture isolation plugs were drilled out without incident. The maximum 24 hour measured oil rate during the drill-out operation was 1,439 bopd.
Tuesday, June 28, 2011
Samson O&G's Rodney 1-14H Producing: 1,439 BOPD
Link here.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.