Locator: 50035PIPELINES.
Updates
April 30, 2026: President Trump signs order authorizing Bridger Pipeline's proposed project from US-Canade border to Wyoming, April 30, 2026.
Original Post
I've always argued the biggest mistake made was calling an oil and gas project an "XL" project. "XL oil and gas" is like waving a red flag in front of the Sierra Club.
The Bridger Expansion proposal.
