Tuesday, September 16, 2025

CLR Activity Southeast Of Williston -- September 16, 2025

Locator: 49133B.

Updates

November 8, 2025: it appears taht CLR has completed the drilling of the four new Brakken wells. It appears they started with #40059 and finished with #40056. 


 

Original Post 

CLR is finally drilling the four-well Brakken FIU pad southeast of Williston

These wells are sited in the Last Chance oil field but the drilling unit is a three-section drilling unit, with the last two sections in Cat Walk (sections 30/31-154-100). Disclaimer: I often misread deeds, permits, maps, and almost everything else. If this is important to you, go to the source. Don't rely on my notes. I do the best I can but will make mistakes. And my editor doesn't always catch my errors.)

The maps:



The wells:

  • 40056, conf, CLR, Brakken FIU 2-6H, Catwalk,
  • 40057, conf, CLR, Brakken FIU 3-6H, Catwalk,
  • 40058, conf, CLR, Brakken FIU 4-6H, Catwalk,
  • 40059, conf, CLR, Brakken FIU 5-6HSL, Catwalk,

 

  • 21696, 689, CLR, Vader 1-7H, Last Chance, t3/12; cum 265K 7/25;
  • 42219, conf, CLR, Louisville FIU 7-7HSL, Baker,
  • 42218, conf, CLR, Louisville FIU 6-7H, Last Chance,
  • 42217, conf, CLR, Louisville FIU 5-7H, Last Chance,
  • 42216, conf, CLR, Louisville FIU 4-7H, Last Chance,
  • 42215, conf, CLR, Louisville FIU 3-7H, Last Chance,