Case -- February 21, 2025

Locator: 48407B.

The NDIC case: (the March, 2025, hearing dockets, here).

The maps:


Note: the existng producing wells are operated by CLR. The new locations will be operated by BR.

There are already seven locations in these four sections, but this four-section drilling unit is a new drilling unit and thus a total of 16 new wells will join the plan for the existing seven locations, putting 23 wells in this four-section area, but with three different drilling units: two 1280-acre units; and one 2560-acre unit.

The producing wells:

  • 18472, 364, CLR, Muri 1-27H, Elidah, t3/10; cum 207K 12/24;
  • 19357, 441, CLR, Sandie 1-28H, Elidah, t3/10; cum 214K 12/24;

The current locations:

  • 36698, conf, BR, Sanmuri 4B-UTH-ULW, Elidah, t--; cum --;
  • 36699, conf, BR, Muri 1A-MBH, Elidah, t--; cum --;
  • 36700, conf, BR, Muri 2A-MBH, Elidah, t--; cum --;
  • 36701, conf, BR, Muri 2D-UTH, Elidah, t--; cum --;
  • 36702, conf, BR, Muri 2E-MBH, Elidah, t--; cum --;

The sixteen new locations: TBD.