Locator: 46766XTO.

The well:

  • 35434, SI/NC-->SI/A, XTO, Emma 31X-30E, Alkali Creek, no production data, no activity since 6/19; cum 206K 1/24; FracFocus data available; at NDIC, Three Forks first bench (B1); IP - 716; 40 stages; 10,688,207 lbs; 218,091 bbls fluid; 
  • from the file folder:
    • KOP: reached at 10,011 MD at 0850 hours CDT, June 25, 2021
    • build began: 0850 CDT on June 25, 2021; TVD reached at 1210 hours CDT on June 26, 2012; Three Forks;
      • top of the target window: 15 feet into the Three Forks and extended 10 feet down to a base at 10,436.15 TVD
    • lateral:
      • began at 1415 hrs CDT, June 27, 2012
      • TD: depth of 20,660 MD at 10,330 TVD at 1423 hrs CDT on June 30, 2023
    • so, less than 36 hours for the build; lateral almost exactly three days; 

Full production profile:

PoolDateDaysBBLS OilRunsBBLS WaterMCF ProdMCF SoldVent/Flare
BAKKEN1-202429262825902870176417427
BAKKEN12-202331257525863434199319707
BAKKEN11-202329253624817605145314364
BAKKEN10-2023311223120936363543492
BAKKEN9-20231679383926141289121561
BAKKEN8-20231319321857708405629601063
BAKKEN7-2023001520000
BAKKEN6-202329362035882318816567971310
BAKKEN5-202331453745049132996786831228
BAKKEN4-2023304417442412584102861022325
BAKKEN3-20233153515443857413584117361804
BAKKEN2-202328542553008355938483081030
BAKKEN1-202331361136511683648133930847
BAKKEN12-2022276448653768011241811983435
BAKKEN11-202230919890901692412626109731653
BAKKEN10-2022318621857216662107941073856
BAKKEN9-20221228923000744142564052204
BAKKEN8-20223095839687158941610715623484
BAKKEN7-20223012793127182098717351149202431
BAKKEN6-20223017428174442533515636136192017
BAKKEN5-2022311781017879328991964119431210
BAKKEN4-20222718136181083850420465164484017
BAKKEN3-20222613505132784196414784126572127
BAKKEN2-20223007971000