Locator: 46487GM.
During the boom, Brigham drilled four Pyramid wells on the northwest side of Williston. The pad remained unchanged for quite some time while the city of Williston grew and surrounded this pad, including the new Williston High School and I pretty much forgot about the Pyramid wells. Today, I noted that these wells have been acquired by Grayson Mill and Grayson Mill now has six more locations "on" the same pad:
- 35866, loc, Grayson Mill/Equinor, Hawkeye 16-21 8H (original, 8TFH), Todd,
- 35867, loc, Grayson Mill/Equinor, Pyramid 15-22 XWW 1H, Todd,
- 35868, loc, Grayson Mill/Equinor, Pyramid 15-22 6H (original, 6TFH), Todd,
- 35869, loc, Grayson Mill/Equinor, Pyramid 15-22 5H, Todd,
- 35870, loc, Grayson Mill/Equinor, Pyramid 15-22 7TFH, Todd,
- 35871, loc, Grayson Mill/Equinor, Pyramid 15-22 8TFH, Todd,
All six horizontals will run parallel, north to south, and all will end in section 22 to the south, except #35866, which will end in section 21 to the south, and to the west of section 22.
The production data for the wells have been updated.
From March 3, 2023:
The Pyramid Wells On The Northwest Side Of Williston
Near the New Williston High School
- 22872, 3,091, Grayson Mill/Statoil/BEXP, Pyramid 15-22 4H (changed from 4TFH), Todd, t3/13; cum 279K 7/17; cum 414K 11/23; nice jump in production, 6/23;
- 22873, 2.835, Grayson Mill/Statoil/BEXP, Pyramid 15-22 3H, Todd, 9,132 bbls in first 6 days; s7/5/12; kop7/14/12; td9/10/12; no flare; t3/13; cum 261K 7/17; cm 3700K 11/23;
- 22874, 1,884, Grayson Mill/Statoil, Pyramid 15-22 2TFH, Todd, 32 stages; 3.8 million lbs sand/ceramic; almost no background gas during lateral drilling, t3/13; cum 143K 7/17; cum 201K 11/23;
- 22875, 2,341, Grayson Mill/Statoil, Pyramid 15-22 1H, Todd, t4/13; cum 208K 7/17; cum 290K 11/23; nice jump in production, 11/23;
*****************************
Screenshots
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.