Locator: 45315B.
The well:
- 36761, drl/A, LCU Jessie 6-24H1, drl status noted 9/13/19; first production, 4/21; t--; cum 111K 6/21; 43K in 31 days; a big well; cum 135K 7/21; cum 177K 11/21; cum 189K 1/22; cum 203K 5/22; cum 206K 6/22; cum 219K 11/22; cum 224K 2/23;
From the well file:
- TD: 22,080 (a two-section lateral)
- Geologic tops:
- KO point: 11,118
- Completion details:
- drilling unit -- acres: 6,399 (unitized)
- stimulated: August 18, 2022
- formation: First Bench, Three Forks
- volume: 137,345 bbls
- proppant: 7,372,071 lbs (small to moderate)
- stages: 38
Application for permit:
- surface: 23-153-99
- bottom hole: 26-153-99
- spacing unit: unitized, but a two-section lateral;
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.