Hess With Two More Nice Wells In The Bakken -- February 8, 2021

Judge in Alaska shuts down COP .... and the Bakken just keeps on truckin'. And literally, with the possibility of the DAPL shut down, the Bakken may be truckin'. LOL. But until then. a few things to cheer:

Monday, February 8, 2021: two nice wells coming off the confidential list today.

  • 37067, F/A, Hess, EN-Labar-154-94-1003H-10, 33-061-04619, Alkali Creek, first production, 8/20; t--; cum 134K 12/20; fracked 5/27/20 - 6/5/20; 6.6 million gallons of water; 84.1% water by mass; 42K over 20 days extrapolates to 62K over 30 days;

PoolDateDaysBBLS OilRunsBBLS WaterMCF ProdMCF SoldVent/Flare
BAKKEN12-2020311702017128106482431324006307
BAKKEN11-20203022243221791255134322331471175
BAKKEN10-2020312495525030146513803937530509
BAKKEN9-20203028143281461742144841425722269
BAKKEN8-202020415314133121267562973549620801
  • 36811, AL/A, Hess, TI-Jenson-158-94-08-5H-1, 33-061-04552, Tioga, first production, 8/20; t--; cum 61K 12/20; fracked 6/20/20 - 7/2/20: 7.9 million gallons of water; 86.4% water by mass:
PoolDateDaysBBLS OilRunsBBLS WaterMCF ProdMCF SoldVent/Flare
BAKKEN12-202031968697351567310179101772
BAKKEN11-20203012352122281505399429274668
BAKKEN10-202016481449188999370737070
BAKKEN9-202024181031814024077127171269819
BAKKEN8-2020211571715495257778839881623

From the well files.

The TI-Jensen well:

  • spud: April 4, 2020
  • cease drilling: April 11, 2020
  • seven days
  • middle Bakken
  • logging services began April 5, 2020, 4:55 p.m. CT
  • KOP reached at 9,232' on April 6, 2020, 10: p.m. CT; about 1.5 days
  • curve
    • began: April 7, 6:25 a.m.
    • completed, middle Bakken, 9,232' on April 7, 2020, at 4:30 p.m. CT; less than 12 hours;
  • lateral
    • began: April 9, 2020, 3:45 a.m. CT
    • completed: April 11, 2020, 7:16 a.m. CT; two days drilling
  • total drilling: about four days; 
  • very low gas; franded from 11 to 713 units;

The EN-Labar well:

  • spud: February 20, 2020
  • cease drilling: February 28, 2020
  • target: Three Forks
  • curve
    • began at depth of 10,331' MD, February 23, 2020, at 8:20 a.m. CT 
    • completed: 11,112' MD; February 24, 2020 at 7:00 am. CT; one full day
  • lateral
    • began: February 26, 2020, 1:25 a.m. 
    • completed: 21,353' TD, 10,637.52' TVD; February 28, 2020, 8:55 p.m. CT; 3.5 days 
  • gas: averaged 652 units with a maximum of 2,116 units; 