  • 28088, drl/A, Hess, BW-Spring Creek-149-99-12-1H-4, Cherry Creek, t--; cum 41K 9/20; a 32K month;

Recent production:

PoolDateDaysBBLS OilRunsBBLS WaterMCF ProdMCF SoldVent/Flare
BAKKEN9-202030319723206050332684192687541465
BAKKEN8-2020587128374861513100198511101

FracFocus:

  • fracked 7/14/20 - 7/27/20; 8.976 million gallons of water; typical frack in the Bakken; 87.5% water by mass;

From the file report:

  • spud date: April 24, 2020
  • cease drilling: April 3, 2020
  • original wellbore: 15,972' MD
  • sidetrack 1: 21,548' MD
  • logging services began March 27, 2020, 7:39 a.m.CT
  • KOP reached at 10,660' MD on March 27, 2020, 9:21 p.m. CT
  • curve: began on March 29, 2020, at 2:15 a.m. CT
    • curve landed at 10:47 a.m. March 29th, 2020; holy mackerel!
  • lateral began at 12:06 p.m. CT on March 31, 2020
    • 10' target centered 15' below the top of the middle Bakken;
    • a lower Bakken shale strike occurred at 15,972' MD on April 1, 2020;
    • pulled back; sidetrack began;
    • lateral cease drilling at 21,548' MD on April 3, 2020 at 6:53 p.m. CT; quite incredible;