On SI/NC for quite some time, now completed and producing:
-
31491, F/IAW, Petro-Hunt, USA 153-95-1A-7-4H, Charlson, no production data, was SI/NC 2/19; API 33-053-07044; fracked, 8/20/19 - 8/31/19; 21.2 million gallons of waters; 93.42 percent water by mass; a huge frack;
Production:
Pool | Date | Days | BBLS Oil | Runs | BBLS Water | MCF Prod | MCF Sold | Vent/Flare |
---|---|---|---|---|---|---|---|---|
BAKKEN | 7-2020 | 0 | 0 | 0 | 3 | 0 | 0 | 0 |
BAKKEN | 6-2020 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BAKKEN | 5-2020 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BAKKEN | 4-2020 | 21 | 8596 | 8895 | 7339 | 19156 | 0 | 19154 |
BAKKEN | 3-2020 | 31 | 22654 | 22642 | 18894 | 78948 | 23718 | 55230 |
BAKKEN | 2-2020 | 29 | 28780 | 28714 | 24545 | 71142 | 2839 | 68303 |
BAKKEN | 1-2020 | 31 | 37561 | 37761 | 29215 | 91648 | 0 | 91648 |
BAKKEN | 12-2019 | 7 | 5641 | 5100 | 1196 | 522 | 0 | 522 |
From the file report:
- spacing unit: 2560 acres
- spud date: September 4, 2017;
- cease drilling: September 29, 2017;
- target: middle Bakken
- TD: 21,980'
- logging services began in the Charles formation at 11:30 p.m. CDT, September 10, 2017;
- KOP reached on September 12, 2017, at 2:40 a.m. (if no typo, about 27 hours of drilling the vertical)
- drilling ahead in the curve began on September 12, 2017, at 9:50 p.m.
- curve was landed at 8:30 a.m., September 14, 2017
- lateral began: at 6:30 p.m., September 19, 2017; the lateral was run in four runs;
- TD reached at 12:10 a.m. CDT on September 29, 2017;
Now we know why an older neighboring well, a short lateral showed a 50x jump in production. See this post.