Active rigs:
$40.22 | 9/30/2020 | 09/30/2019 | 09/30/2018 | 09/30/2017 | 09/30/2016 |
---|---|---|---|---|---|
Active Rigs | 11 | 58 | 67 | 58 | 33 |
No new permits.
Nine permits renewed:
- Bruin E&P (6): six FB Clinton permits renewed in Dunn County;
- QEP (3): two MHA permits in Dunn County renewed, and a Cymbaluk Federal permit in Stark County renewed.
Two producing wells (DUCs) reported as completed:
- 31968, SI/A, Petro-Hunt, Klevmoen Trust 153-95-17D-7-4H, Charlson, no production data,
- 37309, drl/A, WPX, Omaha Woman 24-13-12HIL, Squaw Creek, t--; cum --;
- parallels #34611; see this note; halo effect; jump in production;
- spud: April 18, 2019;
- cease drilling: May 16, 2019
- extended long lateral;
- target: Three Forks
- spacing unit: 1920 acre
- logging began within the Charles at 8,300 feet on April 26, 2019, at 12:00 p.m. CT
- KOP reached at 9,810 feet on April 28, 2019, 1:45 a.m.
- lateral began at 11:43 p.m.CT, May 4, 2019
- TD reached at 23,486' on May 16, 2019 at 7:00 p.m. CT
- if no typos, a long time to drill this lateral;
- fracked 7/10/2020 - 7/30/20; 17.242 million gallons of water; 91.86% water by mass
From the file report, #37309, WPX, Omaha Woman:
- drilling unit: 3840 acres; extended long lateral;
- middle Bakken; facies C, D, and E
- spud February 5, 2020; curve operations began February 10, 2020; concluded on February 11, 2020; lateral operation began on April 2, 2020, and concluded on April 5, 2020
- T: 26,883'
- 10' thick target; about 15' below the top of the middle Bakken formation, making the seam about 40' thick; typical for the middle Bakken;
- fracked 8/1/20 - 8/22/20; 8.94 million gallons of water; 84.69% water by mass;
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.