Wednesday, July 1, 2020

A Closer Look At the Kraken Double Eagle Wells In Sanish Oil Field -- July 1, 2020

Note: in a long note like this, there will be content and typographical errors. If this is important to you, go to the source. 

Is anyone interested in the Kraken Double Eagle wells that came off confidential list today? There are three Double Eagle wells on the pad; two came off the confidential list today; the third was released earlier.
  • 36787, drl/A, Kraken, Double Eagle 33-3-3TFH, Sanish, t--; cum 88K after four months;
  • 36786, drl/A, Kraken Double Eagle 33-3 2H, Sanish, t--; cum 146K after four months; 48K month;
First, where are they? See this post. This is where these wells will be tracked.

Production:
  • 36787, drl/A, Kraken, Double Eagle 33-3-3TFH, API: 33-061-04544; Sanish, t--; cum 88K after four months; fracked 11/27/2019 - 12/14/2019; 13.76 million gallons of water; 82% water by mass; friction reducer: 0. 0539;
PoolDateDaysBBLS OilRunsBBLS WaterMCF ProdMCF SoldVent/Flare
BAKKEN5-202030146971475629178000
BAKKEN4-2020301913019158365701721880128865
BAKKEN3-20203123934240675222523934209521467
BAKKEN2-2020292640526380649503153672430435
BAKKEN1-20202418402177644901219783413515299
BAKKEN12-2019355010154923
  • 36786, drl/A, Kraken Double Eagle 33-3 2H, API: 33-061-04543; Sanish, t--; cum 146K after four months; 48K month; fracked 11/27/2019 - 12/14/2019; 11.53 million gallons of water; 82% water by mass; friction reducer: 0. 0506;
PoolDateDaysBBLS OilRunsBBLS WaterMCF ProdMCF SoldVent/Flare
BAKKEN5-202031208032087321755000
BAKKEN4-20203026231258772687324920164228153
BAKKEN3-20203138993392914196538994392434698
BAKKEN2-20202948418482275889559849133058142
BAKKEN1-20202831889315824828533998861924976
BAKKEN12-201932530105524731172
  • 36785, drl/A, Kraken, Double Eagle 33-3 1H, 33-061-04542, Sanish, t--; cum 113K 4/20; fracked 11/27/2019 - 12/12/2019; 9.4 million gallons of water; 83.9% water by mass; friction reducer: 0.04685;
PoolDateDaysBBLS OilRunsBBLS WaterMCF ProdMCF SoldVent/Flare
BAKKEN5-202031140341381715285000
BAKKEN4-20203017497174581788715748120683335
BAKKEN3-20203127160274942892527160290523883
BAKKEN2-2020262966029536353663696940636227
BAKKEN1-20202924717244984116525800575719628
BAKKEN12-20193318068842035422

From the file reports.

36786:
  • second of three wells to be drilled on this pad (sic)
  • spud: 9/17/2019
  • TD: 11/1/2019
  • total depth: 21,448'
  • a toe-up, three-string, double section lateral
  • target: middle Bakken
  • target zone: 10' thick between 22' and 32" below the top of the middle Bakken;
  • big rig: began at 0714 hours, October 17, 2019, at 8,300' MD
  • KOP: began at 9,760'; begun at 0712 hours, October 28, 2019
  • middle Bakken
    • encountered at 10,345'MD; landing depth reached at 1442 hours, October 28, 2019 (wow)
  • lateral:
    • began at 1952 CT, OCtober 29, 2019
    • without incident, drilling continued to TD of 21,448' MD; reached at 1704 hours, November 1, 2019;
  • gas shows: 1956 units at 10405' in the middle Bakken
  • lateral in the target zone (see above)
36787:
  • second of three wells to be drilled on this pad (sic)
  • spud: 9/18/2019
  • TD: 11/12/2019
  • total depth: 22,645'
  • a toe-up, three-string, double section lateral
  • target: Three Forks
  • target zone: 10' thick between 20' and 3" below the top of the Three Forks;
  • big rig: began 0817 hours, November 5, 2019, at 8,300' MD
  • KOP: began at 0245 hours, November 6, 2019
    • encountered the Three forks at 10,459' MD at 1241 hours, November 6, 2019
  • lateral: began at 2252 hours CT November 7, 2019
    • drilling continued to a depth of 15,741' MD reached at 0851 hours CT, November 9, 2019;
    • BHA tripped; changes; drilling resumed that day; 
    • drilling until 19.204' MD, then tripped again;
    • finally reached 22,645' MD at 1940 hours on November 12, 2019 (wow)
  • TD reached about 1.04' below the top of the target zone (wow)
  • gas units as high as 1372 units at 10435' MD in the vertical and the curve, in the lower Bakken;
  • gas shows: gas units as high as 1913 unit at 19276' MD
36875:
  • second of three wells to be drilled on this pad (sic)
  • spud: 9/16/2019
  • TD: 10/23/2019
  • TD: 19,955' MD
  • a toe-up, three-string, double section lateral
  • target: middle Bakken
  • target zone: 10' thick between 20' and 30" below the top of the middle Bakken;
  • drilling similar to above
  • KOP, building the curve, landing: required two BHAs; 12 hours;
  • lateral: look at this, if no typos --
    • began 0704 hours, October 21, 2019
    • reached TD of 19,955' at 0614 hours on October 23, 2019
    • one hour short of two full days!!! -- I'll tag this post with "records"
  • gas units: a high of 2491 units at 18157' MD
  • geosteering: 10' target located between 22' and 25' (sic) below the top of the middle Bakken

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.