It took a while, but here we go. From a note last August:
August 5, 2019: the CLR Steele wells in Banks oil field, #31520 - #31523, inclusive; #27550; #27551;
This page won't be updated; these are tracked at that link above.
These wells are still listed as
SI/NC (
DUCs) but they have been fracked and have now reported initial production. These are going to be huge wells:
The wells (the new ones plus the older ones):
- 31520, SI/NC, CLR, Steele Federal 5-24H1, extrapolates to 37K; fracked 12/14/19 - 12/23/19; 8.2 million gallons of water; 87.8% water by mass; friction reducer, 0.06636;
Pool | Date | Days | BBLS Oil | Runs | BBLS Water | MCF Prod | MCF Sold | Vent/Flare |
BAKKEN | 1-2020 | 15 | 18309 | 18011 | 36250 | 34409 | 26459 | 7950 |
- 31521, SI/NC, CLR, Steele Federal 6-24H, extrapolates to 55K; fracked 12/15/19 - 12/23/19; 9.4 million gallons of water; 86.4% water by mass; friction reducer, 0.06915;
Pool | Date | Days | BBLS Oil | Runs | BBLS Water | MCF Prod | MCF Sold | Vent/Flare |
BAKKEN | 1-2020 | 15 | 27395 | 27003 | 24222 | 47768 | 38629 | 9139 |
- 31522, SI/NC, CLR, Steele Federal 8-24H1, extrapolates to 36K; fracked 12/1/19 -12/13/19; 9 million gallons of water; 88.2 % water by mass; friction reducer, 0.06982;
Pool | Date | Days | BBLS Oil | Runs | BBLS Water | MCF Prod | MCF Sold | Vent/Flare |
BAKKEN | 1-2020 | 13 | 17158 | 16783 | 19229 | 31848 | 28327 | 3521 |
- 31523, SI/NC, CLR, Steele Federal 9-24H, extrapolates to 32K; fracked 12/2/19 - 12/13/19; 10.6 million gallons of water, 86.88% water by mass; friction reducer, 0.06511;
Pool | Date | Days | BBLS Oil | Runs | BBLS Water | MCF Prod | MCF Sold | Vent/Flare |
BAKKEN | 1-2020 | 14 | 15149 | 14870 | 18986 | 29278 | 25449 | 3829 |
- 27550, 1,239, CLR, Steele Federal 3-24AH, t5/15; cum 384K 1/20; extrapolates to 7K; 40 stages; 8 million lbs; 12.9 million gallons of water; ceramic proppant; friction reducer, 0.16372 (no typo -- one wonders if there is a typo at FracFocus, and perhaps should be 0.06372?);
Pool | Date | Days | BBLS Oil | Runs | BBLS Water | MCF Prod | MCF Sold | Vent/Flare |
BAKKEN | 1-2020 | 12 | 2804 | 2405 | 4834 | 3540 | 2621 | 757 |
BAKKEN | 12-2019 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BAKKEN | 11-2019 | 24 | 2062 | 2279 | 1668 | 6368 | 6110 | 0 |
BAKKEN | 10-2019 | 31 | 3553 | 3720 | 2820 | 10264 | 9851 | 0 |
- 27551, 896, CLR, Steele Federal 3-24AH1, t5/15; cum 384K 1/20; extrapolates to 14K; 40 stages; 5.7 million lbs; TD: 22,225 feet; max gas at 20,192' was 4,169 units; gas fairly consistent ranging from 500- 2,000 units throughout the lateral with gas buster venting; 5.9 million gallons of water; sand/ceramic; friction reducer, 0.04637;
Pool | Date | Days | BBLS Oil | Runs | BBLS Water | MCF Prod | MCF Sold | Vent/Flare |
BAKKEN | 1-2020 | 14 | 6733 | 6195 | 19538 | 10384 | 9317 | 878 |
BAKKEN | 12-2019 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BAKKEN | 11-2019 | 23 | 2125 | 2294 | 2235 | 7261 | 6982 | 0 |
BAKKEN | 10-2019 | 31 | 3521 | 3525 | 3140 | 11378 | 10967 | 0 |
- 19915, 743, CLR, Steele 1-24H, Banks, t8/11; cum 390K 1/20; offline 11/19- 1/20 for part of each month; off line most of 12/19;
- 22273, 609, CLR, Steele 2-24H, Banks, t5/12; cum 265K 1/20; offline 11/19- 1/20 for part of each month; off line most of 12/19;
All Steele / Steele Federal wells in Banks field:
- 19915, Steele 1-24H -- above
- 22273, Steele 2-24H -- above
- 27550, Steele Federal 3-24AH -- above
- 24333, Steele Federal 3-24H -- pending
- 24332, Steele Federal 4-24H -- pending
- 31520, Steele Federal 5-24H1 -- above
- 31521, Steele Federal 6-24H -- above
- 31522, Steele Federal 8-24H1 -- above
- 31523, Steele Federal 9-24H -- above
- 27551, Steele Federal 4-24AH1 -- above
From the file report, #31520:
- spud: June 1, 2019
- TD: July 16, 2019
- TD: 22,157 feet
- a three section lateral, Three Forks first bench, see note below
- vertical
- target of 11,199' TVD; five trips; began June 1, 2019; official logging began at 8,750' on June 5th
- KOP: reached at 10,720' MD
- curve: began June 7, 2019; drilled in 14.5 hours;
- lateral: Cyclone 35 drilled out of the shoe on the morning of July 12, 2019
- encountered many hard streaks (sic; strikes?)
- TD reached at 01:55 hours on July 16, 2019 (slightly less than four days)
- 100% of the footage in the target zone; and 100% within the first bench;
From the file report, #31521:
- spud: May 21, 2019
- TD: July 9, 2019
- TD: 21,899 feet
- a three-section lateral, middle Bakken; see note below;
- official logging began at 8,750 feet on June 11, 2019
- target of 11,126' TVD for the vertical
- curve began just after midnight on June 14, 2019; one trip; casing/cement completed June 16, 2019
- drilled out of the shoe on the morning of July 7, 2019
- TD: July 9, 2019, 17:57; one BHA run;
- drilling time for the lateral: an astounding 2.5 days
- within the target zone 100%
- background gas averaged 781 units throughout the lateral; highest gas observed was 5,410 units at 21,021' MD during connection/downtime gas;
Note: they call these "three-lateral" wells which led me to believe they were extended long reach wells, but it appears they are the typical two-section wells, but are sited in a "third section" so as to get the full lateral within the two-section lateral.