The well:
- 36089, SI/NC, WPX, Ruby 31-30HEL, Antelope-Sanish, fracked 6/6/19 - 6/14/19; 4.7 million gallons of water (a very small frack); 83.8% by mass; sand, 15.3% by mass, t--; cum --;
Pool | Date | Days | BBLS Oil | Runs | BBLS Water | MCF Prod | MCF Sold | Vent/Flare |
---|---|---|---|---|---|---|---|---|
SANISH | 8-2019 | 26 | 30393 | 30479 | 17958 | 36836 | 30106 | 2674 |
SANISH | 7-2019 | 17 | 20617 | 21014 | 7164 | 24989 | 0 | 22185 |
SANISH | 6-2019 | 21 | 648 | 165 | 6028 | 786 | 0 | 186 |
From the well file:
- spud, April 11, 2019 (sic -- double checked)
- surface casing already set; measured depth of 21,094 feet reached April 23, 2019 (sic -- double checked)
- the entire well bore was drilled within the middle Bakken
- the curve section was begun on February 21, 2019 (sic -- double checked -- this is probably an error; probably should have been April 13 or thereabouts), and was completed on April 14, 2019 (sic)
- drilling of the lateral began on April 19, 2019, and completed at 21,094' MD on April 23, 2019;
- one can see the error in dates in this screenshot from the file report:
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.