Friday, November 16, 2018

Eight New Permits; Six DUCs Reported As Completed -- November 16, 2018

Active rigs:

$56.68😓11/16/201811/16/201711/16/201611/16/201511/16/2014
Active Rigs63553863186

Eight new permits:
  • Operators: XTO (6); Whiting (2)
  • Fields: Alkali Creek (Williams), Elk (McKenzie)
  • Comments: XTO has permits for a 6-well Tom State pad in 1-154-95; Whiting has permits for a two-well Nelsen pad in lot 4, section 2-151-102;
Six producing wells (DUCs) reported as completed:
  • 32022, 1,449, Hess, CA-Stangeland-155-95-2128H-4, Capa, t10/18; cum --
  • 33533, 2,444, Hess, AN-Gudbranson-153-94-2215H-8, Elm Tree, t10/18; cum --
  • 33532, 1,407, Hess, AN-Gudbranson-153-94-2215H-9, Elm Tree, t10/18; cum --
  • 34278, 1,643, Thomas 13-3-2TFH, Truax, t10/18; cum --
  • 34446, 2,284, Rennerfeldt 41-3-6TFHU, Stockyard Creek, t9/18; cum 37K after 27 days;
  • 34444, 2,207,  Rennerfeldt 41-3-1HU, Stockyard Creek, 4 sections, t9/18; cum 24K after 25 days;
Comments:

#34444 / #34446:
  • neighboring wells of interest:
  • #26030: jump in production from 1,800 bbls/month to 6,645 bbls/month
  • #26032: no jump in production see first month well was brought back on line
  • #24124: jump in production from 3,000 bbls/month to 6,000 bbls/month

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.