Kraken Operating is not afraid of using sand -- using in excess of 20 million lbs. Wow.
CLR has a great second bench well. Think about that for a minute. And the roughnecks are still drilling the vertical in two days, building the curve in about 1.5 days; and drilling the lateral in about 2.5 days. I think this incredibly remarkable. And they do it day after day, and rarely do they have a "miss." Anyone that's followed the oil industry has to know that it's just remarkable to have success rates like this. And I guess that's why it's called the "manufacturing" stage in the Bakken.
Monday, October 15, 2018:
- 34473, SI/NC, XTO, FBIR Ironwoman 31X-10G, Heart Butte, no production data,
- 34140, SI/NC, WPX, Raptor 13-24HEL, Reunion Bay, no production data,
- 29773, 213, Slawson, Gobbler Federal 3-35-26TFH, Big Bend, no presidential pardon for this one, just in time for Thanksgiving; t8/18; cum --; vertical drilled in 55 hours; drilling of the curve began on May 7, 2018, just after midnight, and completed in 15 hours; the lateral section begun in late afternoon on May 9, and was drilled in 51.5 hours; TD of 20,190 feet; gas peaked at 2,717 units; the wellbore was in the zone 100%;
- 34472, SI/NC, XTO, FBIR Ironwoman 31X-10C, Heart Butte, no production data,
- 33821, 961, Oasis, Lite 5393 11-11 3BX, Sanish, 50 stages; 10.1 million lbs, big well; t4/18; cum 102K 8/18;
- 33454, 738, Equinor Energy, Weisz 11-14 6H, Painted Woods, 48 stages; 9.5 million lbs, t4/18; cum 35K 8/18;
- 34418, 930, Kraken Operating, Michelle Lauren 1H, New Home, 60 stages; 20 million lbs, a nice well; t4/18; cum 84K 8/18;
- 34417, 679, Kraken Operating, Ellie Rose 11TFH, New Home, 60 stages; 20 million lbs, a nice well; t4/18; cum 75K 8/18;
- 33820, 683, Oasis, Lite 5393 11-11 4TX, Sanish, 50 stages; 10 million lbs, a nice well; t4/18; cum 81K 8/18;
- 33558, 2,294, CLR, Mountain Gap 4-10H2, Rattlesnake Point, second bench; two days to drill vertical portion; the curve took about 36 hours to build; error in reporting dates so unable to tell how long it took to drill the lateral, probably two days; gas exceeded 6,000 units; at one time reaching 7,800 units; flare maxed at 5 feet; 64 stages; 10 million lbs, a huge well; t7/18; cum 77K 8/18;
- 32019, SI/NC, Hess, CA-Stangeland-155-95-2128H-7, Capa, no production data,
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.