Much to see at the update, but take a particular good look at the well that started it all, the BR Mary Ann well at this post. Note that this well, drilled back in 2008, was a Three Forks 1st bench well. This would have been one of the first Three Forks wells drilled in the Bakken. Be sure to scroll through the production profile. There is no evidence this well has been re-fracked.
Note: there was a lot of data to go through, and I was working under less-than-ideal conditions, so there may be typographical and factual errors. If this information is important to you, go to the original source.
Also, deep into the weeds, note the number "41' in the legal name of this well:
- 28347, 1,656, BR, Lillibridge 41-27MBH, Johnson Corner, 4 sections, t3/15; cum 287K 5/18;