Tonight, I see that one of those wells on that list -- all the way back to 2011 -- has now been re-fracked:
- 17164, 340, MRO, Repp Trust 34-9H, Bailey, t11/08; cum 200K 11/17; according to FracFocus it was re-fracked 6/15 - 23/2017; the sundry form in the NDIC file shows that it was a 32-stage frack with 5.6 million lbs proppant. Production since the frack:
Pool | Date | Days | BBLS Oil | Runs | BBLS Water | MCF Prod | MCF Sold | Vent/Flare |
---|---|---|---|---|---|---|---|---|
BAKKEN | 11-2017 | 30 | 12038 | 11977 | 17878 | 7059 | 0 | 5595 |
BAKKEN | 10-2017 | 31 | 14582 | 14655 | 21574 | 9104 | 3735 | 3625 |
BAKKEN | 9-2017 | 30 | 15302 | 15377 | 25792 | 8934 | 298 | 6829 |
BAKKEN | 8-2017 | 31 | 16404 | 16135 | 30598 | 9355 | 91 | 7334 |
BAKKEN | 7-2017 | 30 | 12479 | 12512 | 20031 | 4428 | 1541 | 1386 |
BAKKEN | 6-2017 | 7 | 2335 | 2252 | 270 | 1298 | 0 | 1018 |
BAKKEN | 5-2017 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BAKKEN | 4-2017 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BAKKEN | 3-2017 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Production after the original frack, an open hole frack with 543,000 lbs sand:
BAKKEN | 3-2009 | 31 | 2312 | 2121 | 497 | 871 | 871 | 0 |
BAKKEN | 2-2009 | 28 | 2489 | 2655 | 595 | 922 | 922 | 0 |
BAKKEN | 1-2009 | 31 | 3496 | 3344 | 903 | 1126 | 1126 | 0 |
BAKKEN | 12-2008 | 27 | 4107 | 4246 | 1077 | 1813 | 317 | 1496 |
BAKKEN | 11-2008 | 28 | 5918 | 5645 | 2765 | 2160 | 0 | 2160 |
BAKKEN | 10-2008 | 2 | 163 | 0 | 175 | 59 | 0 | 59 |
******************************
Another MRO Re-Fracked Well
- 17171, 391, MRO, Fred Hansen 34-8H, Bailey, t10/08; cum 270K 11/17; re-frack with 45 stages, 5.6 million lbs proppant; original frack back in 2008; open-hole frack with 556,220 lbs sand;
Pool | Date | Days | BBLS Oil | Runs | BBLS Water | MCF Prod | MCF Sold | Vent/Flare |
---|---|---|---|---|---|---|---|---|
BAKKEN | 11-2017 | 30 | 12002 | 12066 | 11587 | 7008 | 3310 | 2238 |
BAKKEN | 10-2017 | 31 | 14805 | 14624 | 14256 | 14312 | 9124 | 3420 |
BAKKEN | 9-2017 | 30 | 17232 | 17296 | 18269 | 9351 | 0 | 7329 |
BAKKEN | 8-2017 | 31 | 20548 | 20366 | 27684 | 11259 | 109 | 8769 |
BAKKEN | 7-2017 | 29 | 16897 | 16945 | 25461 | 10216 | 3639 | 4605 |
BAKKEN | 6-2017 | 11 | 9100 | 9142 | 5202 | 4883 | 1099 | 2748 |
BAKKEN | 5-2017 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BAKKEN | 4-2017 | 5 | 138 | 141 | 68 | 95 | 43 | 23 |
BAKKEN | 3-2017 | 31 | 625 | 581 | 349 | 544 | 282 | 34 |
Production after initial frack:
|
It will be most interesting when EOG begins a re-fracking program in the Parshall oil field.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.