Thursday, September 3, 2015

QEP With Seven (7) New Permits For Grail Oil Field; BR Reports Three High-IP Wells -- North Dakota, September 3, 2015

Active rigs:


9/3/201509/03/201409/03/201309/03/201209/03/2011
Active Rigs75193186192198

Seven (7) new permits --
  • Operator: QEP (7)
  • Field: Grail
  • Comments: 23-149-95 in Grail oil field (see below)
One well coming off the confidential list Friday:
  • 30176, drl, XTO, Stenehjem 31X-28H, Siverston, no production data,
Three (3) producing wells completed:
  • 29424, 1,200, BR, Kings Canyon 4-8-34MBH, Camel Butte, 4 sections, t8/15; cum --
  • 29467, 1,566, BR, Kings Canyon 6-8-34UTFH, Camel Butte, 4 sections, t8/15; cum -- 
  • 29517, 2,669, BR, LaCanyon 8-8-34MBH ULW, Blue Buttes, 4 sections, t8/15; cum --
QEP renewed seven (7) permits, MHA permits in Dunn County.

Slawson renewed two (2) Moleback permits in Mountrail County.


Grail oil field today:


QEP propose 7-well pad in section 23-149-95, Grail oil field:


My maps can be wrong. If this information is important to you, go to the source, either NDIC or QEP.

No comments:

Post a Comment