Link here.
Samson O&G advised that the Everett #1-15H well is drilling ahead in the lateral at a measured depth of 13,107 feet.
The lateral is being drilled whilst observing characteristic oil and gas shows. The Everett #1-15H well is Samson’s sixth Bakken well in the North Stockyard Field.
Meanwhile, they are still working on Earl:
Significant progress has been made in recovering the parted tubing string which was being used to drill the isolation plugs in the Earl #1-13H well. The remaining tubing and drilling assembly consists of a 1,200 feet section and the top of this fish has been conditioned such that it should be able to be extracted in the next 24 hours.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.