Update on the Stroh Well With the Broken Casing Plug

This is what makes the blog fun.

Sometime ago I noticed that a Stroh well reported 25 barrels/day on initial production, and suggested that there would be an explanation.

Shortly after that someone left a comment explaining a problem with the well. That was back in September (2010).

Today, I received a comment updating that well. The problem was fixed and they are ready to frack the well. That alone was very interesting.  But the rest of the story: the unfracked well flowed at 960 barrels/day based on initial flowback.  So, they will frack later this week.