17046: after being off line for more than year, back on line.
The well:
- 17046, 306, Irene Kovaloff 31-18H, Murphy Creek, t8/08; cum 155K 11/20;
From the file report:
- at the time, this was MRO's seventh middle Bakken project in the Murphy Creek field;
- spud June 11, 2008; kick-off point reached June 21, 2008;
- the curve took 55.5 hours to build (in 2021, operators generally build a curve in 12 - 18 hours;
- required a sidetrack
- target zone 11' thick
- the curve was landed three feet above the target zone approx 10 feet into the middle Bakken;
- the middle Bakken estimated to 28' to 35' thick at this site;
- frack: open hole frack with681,360 pounds 40/70 sand;
Production:
Pool | Date | Days | BBLS Oil | Runs | BBLS Water | MCF Prod | MCF Sold | Vent/Flare |
---|---|---|---|---|---|---|---|---|
BAKKEN | 11-2020 | 30 | 1457 | 1147 | 419 | 1042 | 431 | 344 |
BAKKEN | 10-2020 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BAKKEN | 9-2020 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BAKKEN | 8-2020 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BAKKEN | 7-2020 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BAKKEN | 6-2020 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BAKKEN | 5-2020 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BAKKEN | 4-2020 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BAKKEN | 3-2020 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BAKKEN | 2-2020 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BAKKEN | 1-2020 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BAKKEN | 12-2019 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BAKKEN | 11-2019 | 0 | 0 | 112 | 0 | 0 | 0 | 0 |
BAKKEN | 10-2019 | 1 | 9 | 0 | 55 | 6 | 0 | 5 |
BAKKEN | 9-2019 | 30 | 521 | 601 | 107 | 397 | 0 | 198 |
BAKKEN | 8-2019 | 31 | 629 | 622 | 124 | 465 | 0 | 241 |
BAKKEN | 7-2019 | 31 | 686 | 637 | 125 | 533 | 175 | 131 |
BAKKEN | 6-2019 | 30 | 668 | 795 | 131 | 528 | 291 | 16 |