Jobless claims, link here:
- prior revised: up to 849K from 837K
- forecast: 819K
- actual: 840K
OPEC basket: $40.45
***************************************
Back to the Bakken
Active rigs:
$41.18 | 10/8/2020 | 10/08/2019 | 10/08/2018 | 10/08/2017 | 10/08/2016 |
---|---|---|---|---|---|
Active Rigs | 13 | 56 | 64 | 59 | 33 |
Six new permits, #37890 - #37895, inclusive:
- Operator: Enerplus
- Field: Moccasin Creek (Dunn)
- Comments:
- Enerplus has another "heavy metal" pad with six wells sited in SWSE 08-147-93; located from 1267' FSL to 1200' FLS and 2210' FEL to 2048' FEL: Bismuth, Cadmium, Brass, Tin, Osmium and Gallium;
Seventeen permits renewed:
- EOG (6): s three Liberty LR permits, Mountrail County; two Austin permits, Mountrail County, and a Hardscrabble permit in Williams County
- Equinor (3): three Tufto permits in Williams County;
- Whiting (3): two Lapica permits and one Cvancara permit in Mountrail County;
- Kraken (2): an Anna permit and a Wilder permit, both in Williams County;;;;
- BR: a Mancord permit in Dunn County;
- XTO: an Edwards Trust Federal permit in McKenzie County
- Enerplus: a Brugh Bear permit in McKenzie County
One producing well (a DUC) reported as completed:
- 36697, drl/A, WPX, Pronghorn 22-15HA, Spotted Horn, t--; cum --;
- spud March 20, 2020
- TD: May 11, 2020
- middle Bakken
- curve began on March 23, 2020; completed March 25, 2020
- lateral began on May 8, 2020; TD reached May 11, 2020
- so again, the vertical in a day or two; the curve in a couple of days (though now common to see the curve completed in less than 12 hours); and the lateral drilled in three days; so, again, we're talking drilling days about seven;