According to that blog:
On the engineering front, Hess has changed it’s frac design to 38 stages. This includes 22 sliding sleeves, and 16 plug and perfs. 9 wells have been completed this way with 30-day average IPs of 1,000 bopd. Hess still projects EURs of 550 Mboe. Average drill time is down to 34 days and 7 additional days or so to complete.By the way, one half of the geologist's summary was missing from a recent Hess file report due to the fact that only one side of the two-sided report was photocopied/faxed/published at the NDIC site. That may be why I was unable to locate a copy of the frac report.