The Wells

 The wells have been brought up here for easier tracking. Data in the original post below will not be updated.
  • 33025, 1,752, CLR, Hereford Federal 10-17H1, Elm Creek, 26,836 feet; (#19503, #18138, #19397, #23493, #23495); conf but noted to be producing as of 4/19; t9/19; cum 26K over the first 25 days; cum 95K 11/19;
  • 33026, 2,362, CLR, Hereford Federal 11-17H, Elm Creek, 26,682 feet; conf but noted to be producing as of 4/19; t9/19; cum 36K over first 26 days; cum 96K 11/19;
  • 33027, 2,880, CLR, Hereford Federal 12-17H2, Elm Creek, 26,772 feet; conf but noted to be producing as of 4/19; produced 35K over first 19 days; t9/19; cum 37K over first 19 days; cum 115K 11/19;
  • 33028, SI/NC-->conf--> 3,020, CLR, Hereford Federal 13-17H, Elm Creek, 26,599 feet; produced 28K first full month; t9/19; cum 98K 11/19;
  • 33963, A/n/d --> 2,347, CLR, Hereford Federal 14-17H1, Elm Creek, ~ 26,715 feet from the permit; fracked, flowing, 4/19; produced 17K first full month; t9/19; cum 82K 11/19;
  • 33964, TA, CLR, Hereford Federal 15-17HSL, Elm Creek, ~ 26,579 feet from the permit;
  • 33965, SI/NC-->conf, CLR, Angus Federal 6-16H2, Elm Creek, ~ 26,729 feet; from the permit; produced 25K first full month, 9/19; t9/19; cum 104K 11/19;
  • 35691, SI/NC--> 2,760, CLR, Hereford Federal 15X-17HSL, Elm Tree, produced 26K first full month, 9/19; was fracked 2/19; t9/19; cum 125K 12/19;
Updates

February 7, 2020: updates of several Hereford Federal wells.

July 11, 2018: add these Hereford Federal wells to the list below (this is an 8-well pad along section line of 20-153-94 --
  • 32357, 1,190, CLR, Hereford Federal 2-20H1, Elm Tree, 61 stages; 22.78 million lbs, t9/17; cum 333K 11/19;
  • 32354, 174--conf (noted 9/19), CLR, Hereford Federal 8-20H2, Elm Tree, t8/19; cum 0; has never produced anything; no frack data; API: 33-053-07430; FracFocus says fracked 3/28/17 - 4/15/17; huge frack with 12.6 million gallons of water; 88% water by mass; now, update, 9/19 -- I note that the well is back on the conf list, but it is producing some oil now;
January 31, 2018: see first comment at this post.
These Hereford wells are certainly interesting... after looking this well up in the well files category in premium however, It looks like this well starts in section 20... It goes horizontally almost a half mile in section 20, the goes up through sections 17, 8, and ends up on the north end of section 5... so 3 full miles plus almost 1/2 mile in section 20, so a very long horizontal.
Still impressive, but makes more sense when you divide the stages, sand, etc. by the longer length. It has to do with access point (section 20) and Lake Sakakewea (just north of section 20) so an unusual setup because of the lake. 
January 30, 2018: 32355, 1,217, CLR, Hereford Federal 6-20H1, Elm Tree, Three Forks 1, 61 stages; 15.5 million lbs, mesh, large, small; t8/17; cum 247K 11/19;

January 26, 2018:
  • 32356, 1,054, CLR, Hereford Federal 4-20H2, Elm Tree, Three Forks (2), 28 stages; 6.9 million lbs, mesh, large, small, t9/17; cum 117K 11/19; off line as of 9/19; 
January 23, 2018:
  • 32349, 1,168, CLR, Hereford Federal 9-20H, Elm Tree, 86 stages; 14.3 million lbs, in excess of 100K in first four months of full production; t8/17; cum 410K 11/19; no production first three months of production; TD = 26,960; off line for much of last year; now coming back on line, 9/19;
January 17, 2018:
  • 32351, 1,136, CLR, Hereford Federal 5-20H, Elm Tree, 71 stages; 14.2 million lbs large, small, no ceramic; t8/17; cum 261K 11/19; TD = 26,780
  • 32352, 1,471, CLR, Hereford Federal 3-20H,  Elm Tree, 71 stages, 14 million lbs, large/small, no ceramic, t8/17; cum 248K 11/19; TD = 36,675

January 11, 2018:
  • 32353, 1,558, CLR, Hereford Federal 1-20H, Elm Tree, 69 stages; 25 million lbs sand small/large, t8/17; cum 284K 11/19; TD = 26,786
 Original Post

The other day, an alert reader noted CLR permits for super-long laterals / extended long laterals.

It turns out CLR has permits for four additional permits in the same general location that will also be super-long laterals / extended long laterals: NWNW 21-153-94, Elm Creek oil field. Those permits were from the September 20, 2016, daily activity report:
  • 33025, 1,752, CLR, Hereford Federal 10-17H1, Elm Creek, 26,836 feet; (#19503, #18138, #19397, #23493, #23495); t9/19; cum 26K 9/19;
  • 33026, 2,362, CLR, Hereford Federal 11-17H, Elm Creek, 26,682 feet; t9/19; cum 36K 9/19;
  • 33027, 2,880, CLR, Hereford Federal 12-17H2, Elm Creek, 26,772 feet; t9/19; cum 35K in first 19 days;
  • 33028, drl-> conf, CLR, Hereford Federal 13-17H, Elm Creek, 26,599 feet; produced 28K in first full month (9/19);
The three similar permits from the August 30, 2017, daily activity report:
  • 33963, drl-->conf, CLR, Hereford Federal 14-17H1, Elm Creek, ~ 26,715 feet from the permit; produced 17K if first full month (9/19)
  • 33964, TA, CLR, Hereford Federal 15-17HSL, Elm Creek, ~ 26,579 feet from the permit;
  • 33965, drl-->conf, CLR, Angus Federal 6-16H2, Elm Creek, ~ 26,729 feet; from the permit; produced 25K in first full month (9/19)
The CLR Angus and Angus Federal wells are tracked here; they are all "standard" long laterals, about 21,000 feet long (with the exception of this new one, #33865).

The graphic: in the graphic below, the permits for the new wells that will be super-long laterals / extended long laterals are to the west, permit numbers in the two boxes at the far left.

One can see where earlier super-long laterals / extended long laterals were places under the river.

Like the "original" super-long laterals / extended long laterals, the "new" super-long laterals / extended long laterals will just reach to the middle of the river.

*****************************************