May 25, 2017: production profile is erratic, but nothing of note to report.
Original Post
- 28779, 1,443, BR, Hammerhead 11-26TFH, Sand Creek, a Weatherford operation, 1280-acre spacing, Three Forks B1, very low gas units, 35 stages, 7.3 million lbs, t6/15; cum 125K 5/17;
Pool | Date | Days | BBLS Oil | Runs | BBLS Water | MCF Prod | MCF Sold | Vent/Flare |
---|---|---|---|---|---|---|---|---|
BAKKEN | 5-2017 | 31 | 4521 | 4484 | 5434 | 9719 | 9397 | 245 |
BAKKEN | 4-2017 | 24 | 5586 | 5358 | 5724 | 10127 | 9457 | 639 |
BAKKEN | 3-2017 | 0 | 0 | 3 | 0 | 0 | 0 | 0 |
BAKKEN | 2-2017 | 2 | 66 | 269 | 69 | 158 | 153 | 0 |
BAKKEN | 1-2017 | 31 | 4247 | 4138 | 5387 | 4923 | 2825 | 2021 |
BAKKEN | 12-2016 | 19 | 2198 | 2210 | 2650 | 1155 | 1108 | 0 |
BAKKEN | 11-2016 | 30 | 2684 | 2667 | 3649 | 3827 | 3753 | 0 |
BAKKEN | 10-2016 | 31 | 2743 | 2744 | 4185 | 4305 | 4228 | 0 |
BAKKEN | 9-2016 | 30 | 2692 | 2625 | 4080 | 3609 | 3535 | 0 |
BAKKEN | 8-2016 | 8 | 777 | 823 | 1180 | 660 | 640 | 0 |
BAKKEN | 7-2016 | 30 | 2629 | 2644 | 3644 | 4852 | 4778 | 0 |
BAKKEN | 6-2016 | 30 | 3507 | 3491 | 6317 | 5285 | 5211 | 0 |
BAKKEN | 5-2016 | 31 | 2196 | 2195 | 4024 | 2589 | 2422 | 90 |
BAKKEN | 4-2016 | 20 | 2577 | 2651 | 5087 | 13523 | 13473 | 0 |
BAKKEN | 3-2016 | 31 | 7412 | 7420 | 9118 | 40261 | 40184 | 0 |
BAKKEN | 2-2016 | 29 | 8768 | 8752 | 8948 | 36108 | 36036 | 0 |
BAKKEN | 1-2016 | 31 | 12232 | 12204 | 14462 | 36683 | 36482 | 124 |
BAKKEN | 12-2015 | 31 | 12596 | 12579 | 12762 | 31807 | 31520 | 211 |
BAKKEN | 11-2015 | 25 | 9891 | 9884 | 7341 | 26628 | 26566 | 0 |
BAKKEN | 10-2015 | 31 | 14219 | 14219 | 13959 | 37714 | 37637 | 0 |
BAKKEN | 9-2015 | 30 | 8973 | 8890 | 8430 | 23018 | 22944 | 0 |
BAKKEN | 8-2015 | 3 | 68 | 68 | 366 | 282 | 275 | 0 |
BAKKEN | 7-2015 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BAKKEN | 6-2015 | 14 | 14497 | 14497 | 15267 | 37419 | 20726 | 16658 |
BAKKEN | 5-2015 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BAKKEN | 4-2015 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
This is not particularly out of the norm for BR wells early on in this area of the Bakken (Sand Creek) but it is interesting enough to follow. The file report noted that "a last minute change in the proposed completion optimization, the 4 1/2" 13.5# liner which we ran to 20915' MD was cemented in place with 590 sxs Class G cmt. This would modify the proposed stimulation to a plug and perf with 35 stages."
Because of limited time, I'm only going to post this much and then come back to this one later if I remember.
But note the production profile.
Note the amount of proppant: over 7 million lbs with fairly typical number of stages for Bakken wells in 2015.