Wednesday, August 12, 2015

EOG's Riverview Wells In Clarks Creek

Updates

July 20, 2019: updated graphic --


August 29, 2018
There appears to be an interesting story here. EOG originally permitted about ten wells in the south, running north, and doing the same thing in the north, permitting ten wells in the north and running south. They then PNC'd ten to fifteen permits with plans to have, it appears about half the wells running north to south, and the other half running south to north, heel-to-toe/toe-to-heel in this drilling unit.
Look at the production data for #20513. Pretty nice.
The wells, from the north, running south:

  • 31813, PNC, EOG, Riverview 131-3031H,
  • 31814, PNC, EOG, Riverview 132-3031H,
  • 31815, PNC, EOG, Riverview 101-3031H,
  • 22200, 528, EOG, Riverview4-3031H, 38 stages, 4.4 million lbs; Clarks Creek, t7/12; cum 459K 1/19; off line as of 1/19;
  • 22199, 1,088, EOG, Riverview 100-3031H, Clarks Creek, t6/12; cum 480K 2/19; off line as of 1/19;
  • 31808, SI/NC, EOG, Riverview
  • 31807, SI/NC, EOG, Riverview
  • 31806, SI/NC, EOG, Riverview
  • 31805, SI/NC, EOG, Riverview
  • 31804, SI/NC, EOG, Riverview
The wells, from the south, running north:
  • 20513, 2,365, EOG, Riverview 3-3130H, Clarks Creek, 49 stages; 9.8 million lbs, t3/13; cum 731K 3/19; off line as of 3/19;
  • 32647, PNC, EOG, Riverview 19-3130H, 
  • 32646, PNC, EOG, Riverview 18-3130H, 
  • 32645, PNC, EOG, Riverview 17-3130H,
Original Post
 
I'll start tracking EOG's Riverview wells in Clarks Creek here; there are also EOG Riverview wells in Antelope oil field, which are tracked here. There will be overlap. This is a cut and paste from an earlier post.

The singleton in section 32-152-94:
  • 19247, 1,692, EOG, Riverview 01-32H, Antelope field, the Sanish pool, 15 stages, 9.2 million lbs sand, inactive as of 2/15; back on status as of 7/15; t11/10; cum 23K 1/19;
The 5-well pad in section 32-152-94 is an Enerplus pad, the "Butterfly/Turtle" pad (#27587 - #27591, inclusive) which are tracked here.

The 12-well mega-pad in section 32-152-94:
  • 31445, PNC, EOG, Riverview 107-3229H, Antelope, last checked 1/18;
  • 31447, PNS, EOG, Riverview 109-3229H, Antelope, last checked 1/18;
  • 31449, PNS, EOG, Riverview 111-3229H, Antelope, last checked 1/18;
  • 31450, PNC, EOG, Riverview 1137-3229H, Antelope, last checked 1/18;
  • 31451, PNC, EOG, Riverview 9-3229H, Antelope, last checked 1/18;
  • 31452, PNC, EOG, Riverview 10-3229H, Antelope, last checked 1/18;
  • 31453, PNC, EOG, Riverview 11-3229H, Antelope, last checked 1/18;
  • 31714, PNC, EOG, Riverview 12-3229H, Antelope, last checked 1/18;
  • 31444, PNC, EOG, Riverview 108-3229H, Antelope, last checked 1/18;
  • 31446, PNS, EOG, Riverview 110-3229H, Antelope, last checked1/18;
  • 31448, PNS, EOG, Riverview 112-3229H, Antelope, last checked 1/18;
  • 31713, PNC, EOG, Riverview 120-3229H, Antelope, last checked 1/18;
The singleton in section 30-152-94:
  • 20513, 2,365, EOG, Riverview 3-3130H, 49 stages; 9.8 million lbs sand, choked back as of 5/15; back to full months; t3/13; cum 731K 2/19;
The fourteen (14) EOG permits in Clarks Creek, all on Lot 1, section 30-152-94:
  • 31804, conf, 360' FNL, 1060' FWL; last checked 1/18;
  • 31805, conf, 360' FNL, 1010' FWL; last checked 1/18;;
  • 31806, conf, 360' FNL, 960' FWL; last checked 1/18;
  • 31807, conf, 360' FNL, 910' FWL; last checked 1/18;
  • 31808, conf, 360' FNL, 860' FWL; last checked 1/18;
  • 31809, conf, 360' FNL, 810' FWL; llast checked 1/18;
  • 31810, conf, 290' FNL, 750 FWL; last checked 1/18;
  • 31811, conf, 290' FNL, 800 FWL; last checked 1/18;
  • 31812, conf, 290' FNL, 850 FWL; last checked 1/18;
  • 31813, conf, 290' FNL, 900 FWL; last checked 1/18;
  • 31814, conf, 290' FNL, 950 FWL; last checked 1/18;
  • 31815, conf, 290' FNL, 1000 FWL; last checked 1/18;
  • 22200, 528, EOG, Riverview 4-3031H, 290' FNL, 1,050' FWL, t7/12; cum 434K 11/17;
  • 22199, 1,088, EOG, Riverview 100-3031H, Three Forks, 39 stages; 5.8 million lbs sand, 290' FNL, 1,150' FWL, t6/12; cum 453K 11/17;


The graphic above: we saw this area just a few days ago, when we were discussing EOG's 2Q15 earnings/conference call.
  • 20513, 2,365, EOG, Riverview 3-3130H, Clarks Creek, ESP 3/15, NGL stripping skids removed -- last date of NGL being made at this location was September 24, 2014; skids were placed and first date of NGL being made at this location was August 25, 2014; 49 stages, 9.8 million lbs all sand; t3/13; cum 667K 11/17;
A close-up of the 12 new permits:


For newbies, generally speaking, when new permits are issued, they go to loc status, and then eventually to conf status. These wells are already on conf status, the very day the permits are issued; they can remain on the conf list for six months; this suggests EOG is ready to start drilling.

No comments:

Post a Comment