- 19061, 1,215, Oasis/Zenergy, Payette Federal 10-15H, Dore/Wildcat, Bakken, near the confluence south of Fort Buford, south of the river.
Now look how long it took to get the well fracked. The well was spudded 7/2/10. The IP test date was 2/23/11. Almost 8 months from spud to IP test date. I can bet that it was all due to fracking bottleneck. Incredible. I may have missed it, but I was unable to see number of frac stages in the well file.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.