Wednesday, October 30, 2019

Idle Chatter, Petro-Hunt And The Charlson -- October 29, 2019

Disclaimer: I am inappropriately exuberant about the Bakken. In a long note like this, there will be factual and typographical errors. 

Of all the operators in the Bakken, Petro-Hunt seems to be off the radar scope.

Hold that thought.

There are a lot of great fields in the Bakken. It's impossible for me to come up with a top ten list. Some fields are hot for awhile, then activity slows down and another field becomes hot. Here are some of the fields that always get me excited:
  • Elm Tree
  • Banks
  • Grail
  • Stockyard Creek
  • Reunion Bay
  • Sanish
  • Parshall 
One field that doesn't get a lot of attention but is probably the most interesting. The Charlson. I've blogged about it several times. One of my better, longer posts on Petro-Hunt and the Charlson is at this link.

I was reminded of that when updating a 2560-acre drilling unit in the Charlson.

One of the wells:
  • 16452, 265, Petro-Hunt, USA 14D-4-1H, Charlson, single section, t10/07; cum 374K 8/19;
For newbies:
  • this well was drilled in the very first year of the Bakken boom, 2007
  • this well is now twelve years old
  • for such an old well, its cumulative production is mediocre at best -- but that's by today's standards; in 2007, EURs in the Bakken were pegged at 375,000 bbls; and guess what? that's exactly where this well is
  • but then this:
    • monthly production, after the dreaded Bakken decline, plateaued at around 3,000 bbls/month (which, by the way, is a nice well) 
    • last summer, the 11-year-old well was taken off line for three months to give it a breather (LOL)
    • when it came back on line, production jumped 17,000 bbls/month -- a 5-fold increase in production
  • but there's more: this was the production when this well was first drilled/completed:
BAKKEN2-20082926262633155350135010
BAKKEN1-20083131913198148417141710
BAKKEN12-20073040154051277563656360
BAKKEN11-20072750795120686653565350
BAKKEN10-200727752772981064926192610
BAKKEN9-200725645120000
BAKKEN8-20070000000
BAKKEN7-20070000000
BAKKEN6-20070000000
BAKKEN5-20070000000

The best this well did immediately after being completed, less than 8,000 bbls/month.

Then eleven years later, a jump in production from 3,000 bbls/month to 17,000 bbls/month.

Recent production:
BAKKEN1-201931843484153037788507885
BAKKEN12-20183110701106433439878208782
BAKKEN11-20183011206111863772815608156
BAKKEN10-20183111968120434857894908949
BAKKEN9-2018301435014365537310551010551
BAKKEN8-2018311743917616774412368012361
BAKKEN7-201812755272894030740807408
BAKKEN6-20180000000
BAKKEN5-20180000000
BAKKEN4-201819129413414751129911037
BAKKEN3-2018282503266689023401579761

From a sundry form dated November 26, 2007:
A 12 1/4" surface hole was drilled and 9 5/8" casing cemented without any problems.

An 8 3/4" hole was then drilled to 10,266' MD and 7" casing was ran and cemented.

A 6" hole was then drilled to 15,456' MD and a 4 1/2" liner set and cemented from 10,003' to 10,673' with the remainder of it left open hole. A coiled tubing motor was stuck and lost in the lateral at 10,640'.

When it -- the coiled tubing motor -- couldn't be recovered, a bridge plug was set at 9,953', a window cut in the casing, and a curve built to intersect the old lateral.

Even though the 2nd lateral was drilled in the same direction, it failed to intersect the first lateral. The second lateral was drilled to 14,570' MD and a 4 1/2" liner was ran and cemented from 9,610' to 10,675'.

The well was completed [sic -- drilled to depth] but would not flow so it was sand fractured. It was placed on rod pumping unit 11-21-2007.
Frack data at time of original completion, back in 2007:
  • open hole or perforated interval: 10,675' - 14,570'
  • 72,360 lbs mesh sand
  • 348,500 lbs mesh sand with 5,513 bbls of gelled water
IP: 265

(Some of the data below is a repeat from above.)

First twelve months production, May, 2007 - May 2008:
BAKKEN5-2008311397140370161816180
BAKKEN4-20082715971616333212321230
BAKKEN3-20082823712382211309330930
BAKKEN2-20082926262633155350135010
BAKKEN1-20083131913198148417141710
BAKKEN12-20073040154051277563656360
BAKKEN11-20072750795120686653565350
BAKKEN10-200727752772981064926192610
BAKKEN9-200725645120000
BAKKEN8-20070000000
BAKKEN7-20070000000
BAKKEN6-20070000000
BAKKEN5-20070000000

It was refracked from January 24, 2015, to January 26, 2015, according to FracFocus, with a very, very small completion: 1.3 million gallons of water; 88.9% water by mass; sand, 8.85% by mass. 

Plateaued to 2,000 bbls/month through most of its life; representative profile, July, 2016, to July, 2017:
BAKKEN7-20172525042194111316881557127
BAKKEN6-20171717511674190731692725347
BAKKEN5-2017144875444574263700
BAKKEN4-2017291712170813001936175610
BAKKEN3-20173125962620862300727910
BAKKEN2-20172826392639935295127560
BAKKEN1-2017202176217069221428321174
BAKKEN12-20163023502335623327403068
BAKKEN11-20163022602250687311202903
BAKKEN10-2016312498253289020161692108
BAKKEN9-2016121256116956710719870
BAKKEN8-20162420642097607218420170
BAKKEN7-20163128392879865289726810

It was taken off line for four months, summer of 2018, and this was the production when it came back on line; it was not re-fracked:
PoolDateDaysBBLS OilRunsBBLS WaterMCF ProdMCF SoldVent/Flare
BAKKEN8-201929252524522105625206252
BAKKEN7-20192641844264225112471012471
BAKKEN6-201930523553222648604106041
BAKKEN5-20193165616521201110508010508
BAKKEN4-201930655065132052599705955
BAKKEN3-201930679968022617677706568
BAKKEN2-201928741974932492648706341
BAKKEN1-201931843484153037788507885
BAKKEN12-20183110701106433439878208782
BAKKEN11-20183011206111863772815608156
BAKKEN10-20183111968120434857894908949
BAKKEN9-2018301435014365537310551010551
BAKKEN8-2018311743917616774412368012361
BAKKEN7-201812755272894030740807408

So, did you catch that. Petro-Hunt wasn't even going to frack this well. They drilled to depth. But the well would not flow. So, they pumped a bit of sand and a bit of water down the wellbore and they had a well.

There are some fields that seem particularly well-suited for re-fracks. The Charlson is one of them. Reunion Bay seems to be another.

By the way, look at this Petro-Hunt Charlson well, only three years old and trending toward one million bbls cumulative, and a very moderate frack:
  • 28016, 912, Petro-Hunt, USA 153-95-22D-15-1HS, middle Bakken, 37 stages; 4.7 million lbs, Charlson, t11/15; cum 721K 8/19; huge well; still at 8,000 bbls/month, 8/19;

Random Update Of A 2560-Acre Drilling Unit In The Charlson Oil Field -- October 30, 2019

This is an incredible location. There are a lot of wells here, but in the big scheme of things, many more wells are likely to be drilled, and I assume most of these are middle Bakken wells; if such, they still have the Three Forks to drill.

Charlson oil field:

  • 1280-acre units
    • 22/15-153-95
    • 23-14-153-95
  • 640-acre unit: 23-153-95
  • 1280-acre units: 22/15-153-95
  • 1280-acre units: 23/14-153-95
  • 2560-acre unit: 23/22/14/15-153-95 (?); could be others
Wells of interest:
  • 27056, a line well, sited in section 28, runs north along west section line of section 22; end in section 22; 1,803, Petro-Hunt, Van Hise Trust 153-95-28D-21-2HS, t9/14; cum 372K 8/19; steady Eddy; down to 3,000 bbls/month, 8/19; spacing, 4 section (2560-are): sections 21/22/27/28-153-95;

  • 30569, 564, Petro-Hunt, USA 153-95-22C-15-6H, middle Bakken, 41 stages; 10 million lbs, 2 sections, Charlson, t10/18; cum 184K 8/19; huge well; very new, 8/19;
  • 19979, 817, Pertro-Hunt, USA 153-95-22D-15-1H, 2 sections, Charlson, t7/11; cum 620K 8/19; huge well; but old, but recent jump in production, 8/19;
  • 22334, 2,006, Petro-Hunt, USA 153-95-22C-15-2H, Charlson, t12/12; cum 451K 8/19; steady Eddy; continues to do well at almost 3,000 bbls/month, 8/19;
  • 26214, 2,122, Petro-Hunt, USA 153-95 22C-15-3H, Charlson, t1/14; cum 569K 8/19; steady Eddy; holding up well; at 6,000 bbls/month, 8/19;

  • 28018, 835, Petro-Hunt, USA 153-95-22D-15-4H, Charlson, t10/16; cum 496K 8/19; huge well; still at 8,000 bbls/month, 8/19;
  • 28017, 830, Petro-Hunt, USA 153-95-22D-15-5H, Charlson, t10/16; cu 466K 8/19; huge well; still at 7,000 bbls/month, 8/19;
  • 28016, 912, Petro-Hunt, USA 153-95-22D-15-1HS, middle Bakken, 37 stages; 4.7 million lbs, Charlson, t11/15; cum 721K 8/19; huge well; still at 8,000 bbls/month, 8/19;
  • 28015, 816, Petro-Hunt, USA 153-95-23C-14-2HS, Charlson, four sections, t101/6; cum 538K 8/19; huge well; still at 10,000 bbls/month, 8/19;
  • 30183, 724, Petro-Hunt, Sherven Trust 153-95-27A-7HS, middle Bakken, 26 stages, 2.1 million lbs; Charlson, two sections, t10/16; cum 208K 8/19;

  • 29090, 1,032, Petro-Hunt, USA 153-95-23C=14-6H, Charlson, t7/18; cum 242K 819; huge well;
  • 29091, 1,031, Petro-Hunt, USA 153-95-23C-14-5H, Charlson, t6/18; cum 223K 8/19; huge well;
  • 32165, 1,090, Petro-Hunt, USA 153-95-23C-14-4H, Charlson, t5/18; cum 254K 8/19; huge well;
  • 33812, 1,480, Petro-Hunt, USA 153-95-23D-14 3H, Charlson, t7/18; cum 232K 8/19; huge well;
  • 33813, 1,595, Petro-Hunt, USA 153-95-23D-14-2H, Charlson, t7/18; cum 396K 8/19; huge well;
  • 33814, 1,773, Petro-Hunt, USA 153-95-23D-14 1H, Charlson, t7/18; cum 308K 8/19; huge well;
  • 33817, 683, Petro-Hunt, USA 153-95-23D-1411HS, two sections, Charlson, t7/18; cum 373K 8/19; huge well;

  • 17799, 457, BR, Guadalupe 11-23H, one section, Charlson, t3/09; cum 542K 8/19; huge jump 7/18; not re-fracked;

  • 16452, 265, Petro-Hunt, USA 14D-4-1H, one section, open hole, 425,000 lbs sand, Charlson, 10/07 cum 374K 8/19; huge jump 8/18;

Notes From All Over, All Politics -- California -- October 28, 2019

Link here.


From wiki:
Under the current Democratic Party selection rules, adopted in 2006, pledged delegates are selected under proportional representation, which requires a candidate have a minimum of 15% of a state's popular vote to receive delegates.
I have trouble believing each of the three front-runners -- Biden, Pocahontas, Sanders -- won't each get at least 15%. Having said that, I can imagine Biden imploding in California, with Sanders and Pocahontas stealing enough votes from Biden to put him below the 15% threshold.

But if each of the three front runners get a 35 - 35 - 30 split, then we go into the DNC convention with no one having 50% plus one delegate. In the 2016 primary, Hillary really did not have a credible opponent until late in the process when Bernie Sanders finally made a presence. But Hillary also owned the "super-delegates." That is different this time around.

None of the three front-runners have the commanding lead that Hillary had, and the super-delegates cannot vote in the first round if the front runner doesn't already have 50% delegates +1. Super-delegates can only begin voting in the second round if no one candidate has 50% + 1 delegate coming into the convention.

There are many reports that Buttigieg is surging. But to get even one delegate in any state he needs to poll at least 15%. He is nowhere close to that yet.

I have trouble seeing the top three garnering less than seventy percent combined. That leaves 30% -- Harris, Buttigieg, and Yang would share that 30%, none of them reaching the 15% threshold.

Tea Leaves -- Idle Rambling -- October 30, 2019

First things first: before we get to BYD, LOL-funny. Special mid-week edition.
As the Babylon Bee puts it, who knew that Trump could get Democrats to interrupt baseball, condemn dogs, and side with terrorists—all within the space of 24 hours? In any case, who knew that a frequent theme of the Week in Pictures—hero dogs—would become a front page headline?
I haven't seen a Babylon Bee "reference" in weeks and in the past twelve hours, I get two Babylon Bee "hits." One from a reader late last evening, and then the one above.

From the perspective of an old man who sort of watches the EV industry: things don't look real promising.

From this morning:


More and more, EVs look like a toy for the elite.

It will be interesting to see how this story is spun. Ford is betting the company on EVs.


Only One Well Comes Off The Confidential List Today -- October 30, 2019

First things first: Buffett-backed EV company profits plunge 89% year-over-year on disappointing sales. Link.
“As subsidies on new energy vehicles drop sharply, sales of new energy vehicles are falling short of expectations. It is expected that the profit of the company’s new energy vehicle business will also decline to a certain extent compared with the same period of last year,” BYD said in a stock exchange filing.
Disclaimer: this is not an investment site.  Do not make any investment, financial, job, travel, career, or relationship decisions based on what you read here or think you may have read here.
 

First things first: huge shout-out to Starbucks -- coffee "on the house" this morning -- I came in despite fierce rain, cold; breakfast free with "stars" rewards; what a great country.

First things first: seventh and final game of the World Series tonight.

First things first: Apple, Inc, reports earnings after the market closes this afternoon

Fourth straight inventory build: right in line with expectations -- small build; less than a million bbls; EIA to report later this morning.

Texas advertises in California: "we have electricity." Governor Newsome disputes; says it's not possible to have electricity 24/7; questions whether Texas even exists.

Gasoline: regular unleaded gasoline down to $2.08 almost everywhere in north Texas. Actually, I suppose most signs show $2.18/gallon but it's easy to find $2.08/gallon. And then I see that US crude oil inventories increased again last week -- albeit at a very small pace.

*************************************
Back to the Bakken

Active wells:


$55.5110/30/201910/30/201810/30/201710/30/201610/30/2015
Active Rigs5968523470

Only one well coming off the confidential list today --Wednesday, October 30, 2019: 95 for the month; 95 for the quarter:
  • 35280, 409, Enerplus, Marigold 149-93-21B-22H-LL, Mandaree, t4/19; cum 66K 8/19;
RBN Energy: a CBR project advances in the Uinta Basin.
To hear proponents of Uinta Basin waxy crude oil tell it, all that’s keeping the hydrocarbon-packed region in northeastern Utah from significantly increasing production in the 2020s is a better way to transport their shoe-polish-like crude to Gulf Coast refineries than trucking to existing transloading facilities. And now, they think they’ve finally found it. If all goes to plan, by early 2023 a new, 85-mile short-line railroad will be in place to move at least two 110-car unit trains of waxy crude a day from the epicenter of Uinta Basin production to interconnections with two long-haul rail lines. That would give producers significantly enhanced access to markets far beyond the five Salt Lake City-area refineries to which they now truck some 90% of their output. Today, we conclude our series on the Uinta Basin with a look at the proposed Uinta Basin Railway crude-by-rail project and what it would mean for the play’s producers, as well as for Gulf Coast refiners.