source: EIA
- based on analysis of 116 E&P companies' annual reports
- the companies added a net 10.3 billion boe to their proved reserves during 2018
- total E&D costs: a nine percent (9%) vs 2017 when calculated as dollars per BOE of proved reserves added
- actual costs actually increased
- costs provide an idea of the expenditures needed to add one barrel of proved reserves
- the 2018 E&D costs incurred at $15.20 per additional boe of proved reserves was the lowest it’s been since 2009