Monday, March 27, 2017

New Wells Reporting: 2Q17

New data, for a new quarter will begin on April 3, 2017.

Data for 4Q16: 4Q16
Data for 3Q16: 3Q16
Data for 2Q16: 2Q16
Data for 1Q16: 1Q16
Data for 4Q15: 4Q15
Data for 3Q15: 3Q15
Data for 2Q15: 2Q15
Data for 1Q15: 1Q15
Data for 4Q14: 4Q14
Data for 3Q14: 3Q14
Data for 2Q14: 2Q14
Data for 1Q14: 1Q14
Data for 4Q13: 4Q13
Data for 3Q13: 3Q13
Data for 2Q13: 2Q13
Data for 1Q13: 1Q13
Data for 4Q12: 4Q12
Data for 3Q12: 3Q12
Data for 2Q12: 2Q12
  Data for 1Q12: 1Q12   
Data for 4Q11: 4Q11 
Data for 3Q11: 3Q11 
Data for 2Q11: 2Q11 
 Data for 1Q11: 1Q11  
 Data for 2H10: 2H10 
Through 1H10: 1H10



Friday, June 30, 2017: 107 for the month; 177 for the quarter.
  • 31137, 2,579, Ovintiv/Newfield, Jorgenson Federal 148-96-10-15-1H, Lost Bridge, t5/17; cum 294K 11/18; (#29857, 32092, 29856, 32581), cum 412K 4/21;
  • 31636, 627, XTO, Lundin 11X-15E, Siverston, t10/17; cum 92K 11/18; cum 144K 4/21; (#26454, 26455)
Thursday, June 29, 2017: 105 for the month; 175 for the quarter.
  • 31635, 3,449, Ovintiv/Newfield, Jorgenson Federal 148-96-10-15-10H, Three Forks, Lost Bridge, producing (#29857, 32092, 29856, 32581), shut in after reaching total depth, but produced 25,000 bbls in first 10 days (if that's not a typo over at the NDIC); according to FracFocus, it was fracked 4/19/17 - 4/22/17; 5 million gallons water; 16% proppant; t5/17; cum 303K 11/18; cum 411K 4/21;
  • 32917, 1,635, XTO, Nygaard Federal 13X-5BXC, Lost Bridge, no production data, (#21702, 24228, 32921, 32920, 17397), t4/19; cum 271K 4/21;
Wednesday, June 28, 2017: 102 for the month; 172 for the quarter.
  •  32440, 446, Nine Point Energy, Little Muddy 21H, Williston, fracked on 11/20/17; small frack: 3.2 million gallons of water; 13% proppant; t1/17; cum 76K 4/17; cum 196K 4/21;
Tuesday, June 27, 2017: 101 for the month; 171 for the quarter.
  • 31138, 2,944, Ovintiv/Newfield, Jorgenson Federal 148-96-10-15-4HLW, Lost Bridge, t5/17; cum 358K 11/18; cum 541K 4/21;
  • 32524, 2,535, MRO, Reno USA 24-9TFH-2B, Antelope-Sanish, t7/17; cum 236K 11/18; cum 324K 4/21;
  • 32918, IA/1,101, XTO, Nygaard Federal 13X-5F2, t6/19; cum 62K 9/19; off line 9/19;
Monday, June 26, 2017: 98 for the month; 168 for the quarter.
  • None.
Sunday, June 25, 2017: 98 for the month; 168 for the quarter.
32525, 4,984, MRO, Kermit USA 14-9H, Antelope-Sanish, t8/17; cum 358K 11/18; cum 464K 4/21;

Saturday, June 24, 2017: 97 for the month; 167 for the quarter.
  • 32526, 3,645, MRO, Arden USA 14-9TFH, Antelope-Sanish, t7/17; cum 238K 11/18; cum 330K 4/21;
  • 32919, 2,335, XTO, Nygaard Federal 13X-5B, t3/19; cum 336K 4/21;
Friday, June 23, 2017: 95 for the month; 165 for the quarter.
  • 24228, IA/424, XTO, Nygaard Federal 13X-5E, Lost Bridge, t5/19; cum 88K 9/19;
  • 31754, 762, CLR, Maryland 3-16H, Catwalk, 38 stages, 17.3 million lbs, t12/16; cum 74K 4/17; cum 192K 4/21;
  • 31755, 213, CLR, Maryland 4-16H1, Catwalk, Three Forks 1, 38 stages, 11.4 million lbs, t12/16; cum 25K 4/17; cum 313K 4/21;
  • 32439, 586, Nine Point Energy, Little Muddy 19H, Williston, 31 stages, 4 million lbs, t1/17; cum 47K 4/17; cum 279K 4/21;
Thursday, June 22, 2017: 91 for the month; 161 for the quarter.
26430, 1,002, WPX, Beaks 36-35HX, Mandaree, Three Forks, 61 stages, 6.1 million lbs; t4/17; cum 17K 4/17; cum 230K 4/21;
32017, 901, Oasis, Rolfson S 5198 14-29 12B, Siverston, 50 stages, 4.1 million lbs, t12/16; cum 144K 4/17; cum 339K 4/21;
32920, 2,162, XTO, Nygaard Federal 13X-5EXH, Lost Bridge, t6/19; cum 165K 4/21;

Wednesday, June 21, 2017: 88 for the month; 158 for the quarter.
29636, 1,673, EOG, Parshall 27-3332H, Parshall, 26 stages, 6.3 million lbs, t12/16; cum 63K 4/17; (#29635)(#29635)
29637, 1,103, EOG, Parshall 24-3332H, Parshall, 27 stages, 6.5 million lbs, t12/16; cum 39K 4/17; (#29635)
32016, 1,554, Oasis, Rolfson S 5198 14-29 11T, Sivertson, Three Forks 1st bench, 50 stages, 4.1 million lbs, t12/16; cum 144K 4/17; [note first comment --
32888, 6,278, MRO, Forsman USA 44-22H, Antelope-Sanish, t12/17; cum 384K 11/18; (#19133 -- no jump in production)

Tuesday, June, 20, 2017: 84 for the month; 154 for the quarter.
26432, 1,388, WPX, Beaks 36-35HA, Mandaree, 61 stages, 9.1 million lbs, t4/17; cum 23K 4/17 (27 days), (#19289)
32438, 1,027, Nine Point Energy (formerly Triangle Petroleum), Little Muddy 17H, Williston, 31 stages, 10 million lbs; TD, 20,940 feet; spud date, July 20, 2016; TD, August 3, 2016, t1/17; cum 55K 4/17;  
32889, 3,707, MRO, Lockwood USA 44-22TFH, Antelope-Sanish, t12/17; cum 289K 11/18;  (#19144)
  • 32921, SI/NC, XTO, Nygaard Federal 13X-5AXD, Lost Bridge, 33-025-03210, no production data, (#21702); appears to be producing; but remains SI/NC as of 3/19; was fracked 5/28/18 - 7/01/18;  
    • 21702, back on status for one day as of 3/19; 
Monday, June 19, 2017: 80 for the month; 150 for the quarter.
32820, 602, WPX, Beaks 36-35HW, Mandaree, Three Forks, 61 stages, 6.9 million lbs, t4/17 cum 209K 3/19; (#19289 -- significant jump, 4/17)
32890, drl, MRO, Murphy USA 34-22TFH-2B, Antelope, no production data, (#19144) 

Sunday, June 18, 2017: 78 for the month; 148 for the quarter.
32209, 1,774, Oasis, Rolfson S 5198 43-20 9B, Sivertson, 50 stages, 4 million lbs, t12/16; cum 290K 3/19;

Saturday, June 17, 2017: 77 for the month; 147 for the quarter.
  • 32891, 4,093, MRO, Begola USA 34-22H, Antelope, t12/17; cum 271K 3/19;  (#19144)
    • 19144, 952, MRO, TAT USA 34-22H, 33-053-03182, Antelope-Sanish, t3/11; cum 444K 3/19; huge jump in production; see production profile here;
Friday, June 16, 2017: 76 for the month; 146 for the quarter.
None

Thursday, June 15, 2017: 76 for the month; 146 for the quarter.
26732, 1,544, QEP, MHA 8-27-34H-148-92, Heart Butte, t5/17; cum 200K 11/18;
29298, 1,744, EOG, Parshall 96-3332H, Parshall, 27 stages; 8 million lbs, t12/16; cum 60K 4/17; (#17621 - no jump in production)

Wednesday, June 14, 2017: 74 for the month; 144 for the quarter.
29299, 988, EOG, Parshall 97-3332H, Parshall, 23 stages; 7 million lbs; t12/16; cum 56K 4/17; (#17621 - no jump in production)

Tuesday, June 13, 2017: 73 for the month; 143 for the quarter.
32210, 1,060, Oasis, Rolfson S 5198, 43-20 10T, Siverston, Three Forks 1st bench, 50 stages, 4.1 million lbs, t12/16; cum 105K 4/17;

Monday, June 12, 2017: 72 for the month; 142 for the quarter.
28728, 400, EOG, Parshall 28-2928H, Parshall, 26 stages, 6.1 million lbs, t12/16; cum 41K 4/17;
29300, 804, EOG, Parshall 98-33H, Parshall, 21 stages; 6.1 million lbs, t12/16; cum 46K 4/17; (#17621 -- no jump in production; slight jump in production back in 5/15)
31890, 2,275, HRC, Fort Berthold 152-94-22D-15-11H, Antelope, 4 sections, 33 stages; 9.9 million lbs, t12/16; cum 121K 4/17; (#20567 - no jump in production)
31986, 400, Petro-Hunt, Kostelnak 145-97-32D-29-5H, Little Knife, t2/18; cum 79K 11/18;

Sunday, June 11, 2017: 69 for the month; 139 for the quarter.
25958, 830, Statoil, Mark 4-9F-3H, Williston, t2/19; cum 17K 30 days;

Saturday, June 10, 2017: 68 for the month; 138 for the quarter.
  • 28726, 1,054, EOG, Parshall 29-2928H, Parshall, 31 stages, 6.5 million lbs, t12/16; cum 31K 4/17;
  • 28727, 374, EOG, Parshall 85-2928H, Parshall, 25 stages; 5.5 million lbs; t12/16; cum 37K 4/17; (#17933 -- jump in production; #17294 -- small jump in production 3/15, but not 12/16)
Friday, June 9, 2017: 66 for the month; 136 for the quarter.
None.

Thursday, June 8, 2017: 66 for the month; 136 for the quarter.
  • 25957, 1,727, Equinor/Statoil, Mark 4-9F 4TFH, Williston, t2/19; cum 19K 26 days;
  • 31889, 1,877, HRC, Fort Berthold 152-94-22D-15-10H, Antelope, Three Forks, 33 stages; 9.9 million lbs, t12/16; cum 129K 4/17; (#20567)
Wednesday, June 7, 2017: 64 for the month; 134 for the quarter.
None.

Tuesday, June 6, 2017: 96 for the month; 134 for the quarter.
25956, 1,828, Equinor/Statoil, Mark 4-9F 5H, Williston, t1/19; cum 14K 21 days;
32097, 1,018, Abraxas, Stenehjem 6H, North Fork, t7/17; cum 187K 11/18;

Monday, June 5, 2017: 94 for the month; 132 for the quarter.
25955, 690, Equinor/Statoil, Mark 4-9F 6TFH, Williston, t1/19; cum 13K 31 days;

Sunday, June 4, 2017: 93 for the month; 131 for the quarter.
31756, 1,163, CLR, Maryland 5-16H, Catwalk, 38 stages, 17 million lbs; TD, 23,027 feet, t12/16; cum 80K 4/17;
32292, 2,387, Equinor/Statoil, Mark 4-9F 7H, Williston, t1/19; cum 43K 26 days;
32512, 1,505, EOG, Mandaree 30-0706H, Squaw Creek, 37 stages, 17 million lbs sand; TD, 20,495 feet, t12/16; cum 157K 4/17; (19004)
32513, 1,910, EOG, Mandaree 24-0706H, Squaw Creek, 44 stages, 28 million lbs sand; TD, 20,483 feet, t12/16; cum 228K 4/17; #19004)

Saturday, June 3, 2017: 89 for the month; 127 for the quarter.
28435, 871, EOG, Fertile 55-0333H, Parshall, Fertile 55-0333H, 50 stages; 12.7 million lbs; t12/16; cum 60K 4/17;
32098, 1,004, Abraxas, Stenehjem 7H, North Fork, t7/17; cum 201K 11/18;
32293, 237, Statoil, Mark 4-9F 8TFH, Williston, t1/19; cum 10K 21 days;
32514, 1,355, EOG, Mandaree 31-0706H, Squaw Creek, 46 stages, 29 million lbs; TD, 20,914 feet, t12/16; cum 247K 4/16; (19004)
Friday, June 2, 2017: 85 for the month; 123 for the quarter.
28434, 1,308, EOG, Fertile 102-0333H, Parshall, 46 stages, 11.91 million lbs, t12/16; cum 92K 4/17;

Thursday, June 1, 2017: 84 for the month; 122 for the quarter.
32099, 1,122, Abraxas Petroleum, Stenehjem 9H, North Fork, t7/17; cum 146K 11/18;
33105, 1,503, Kraken Operating, Coveleski 26-35 3H, Lone Tree Lake, t4/17; cum 257K 11/18; north of Williston; I would not consider this area Tier 1 for the Bakken; maybe Tier 2;

Wednesday, May 31, 2017: 82 for the month; 120 for the quarter.
None.

Tuesday, May 30, 2017: 82 for the month; 120 for the quarter.
None.

Monday, May 29, 2017: 82 for the month; 120 for the quarter.
32100, 1,082, Abraxas Petroleum, Stenehjem 9H, North Fork,t7/17; cum 195K 11/18;
33012, 824, Oasis, Teal 5692 13-22H, Alger, 23 stages, 8.5 million lbs t12/16; cum 55K 3/17;
33106, 1,230, Kraken Operating, Coveleski 26-35 3H, Lone Tree Lake, t4/17; cum 198K 11/18; north of Williston; I would not consider this area Tier 1 for the Bakken; maybe Tier 2;

Sunday, May 28, 2017: 79 for the month; 117 for the quarter.
33107, 1,669, Kraken Operating, Coveleski 26-35 4H, Lone Tree Lake, t4/17; cum 280K 11/18; north of Williston; I would not consider this area Tier 1 for the Bakken; maybe Tier 2;

Saturday, May 27, 2017: 78 for the month; 116 for the quarter.
None.

Friday, May 26, 2017: 78 for the month; 116 for the quarter.


Thursday, May 25, 2017: 78 for the month; 116 for the quarter.
33168, 1,268, Enerplus, Whitney 148-95-12D-01H, Eagle Nest, t7/17; cum 230K 11/18;

Wednesday, May 24, 2017: 77 for the month; 115 for the quarter.
31716, 184, Crescent Point Energy, CPEUSC Aldag 3-35-36-164N-100W, runs west to east (23321, 30622), West Ambrose, t3/17; cum --
33156, 439, Sedalia Energy, Pratt Madison Unit 3H, Pratt, t1/17; cum 24K 3/17; , note: at this post, a graphic showing how Sedalia Energy drilled three laterals from one Madison well;

Tuesday, May 23, 2017: 75 for the month; 113 for the quarter.
31575, 1,530, QEP, TAT 8-33-28BHD, Grail, 65 stages, 9.4 million lbs, t12/16; cum 101K 3/17;
31576, 1,392, QEP, TAT-5-33-28T2HD, Grail, Three Fork 2nd bench, 51 stages, 9.6 million lbs, t12/16; cum 70K 3/17;
31577, 1,800, QEP, TAT 7-33-28BHD, Grail, 51 stages, 9.6 million lbs, t12/16; cum 110K 3/17;
31829, 1,470, QEP, TAT 4-33-28T2HDR, Grail, Three Forks 2nd bench, 65 stages, 10.1 million lbs, t12/16; cum 24K 3/17;(26521, 26522, 26523, 26524)(27792, 27791, 27816, 21465)
33169, SI/NC, Enerplus, Elbert 148-95-12D-01H-TF, Eagle Nest, no production data,

Monday, May 22, 2017: 70 for the month; 108 for the quarter.
  • 30623, 210, Crescent Point Energy, CPEUSC Fairholm 3-34-33-164N-100W, West Ambrose, Three Forks, 35 stages, 2.8 million lbs, t3/17; cum 87K 3/19; runs east to west (31568, 22732); first month's production: 7,275 bbls;
    • 31568, t1/16; cum 222K 3/19; 
    • 22732, t7/12; cum 350K 3/19;  
Sunday, May 21, 2017: 69 for the month; 107 for the quarter.
  • 30725, 658, NP Resources, Beaver Creek State 41-36-1PH, Roosevelt, Pronghorn/Three Forks, 36 stages, 5.6 million lbs, t1/17; cum 19K 3/17; 
  • 32505, 865, Bruin/HRC, Fort Berthold 147-94-1A-12-12H, (20879), McGregory Buttes, Three Forks, 33 stages, 9.9 million lbs, t12/16; cum 281K 3/19; on Halcon's "Oklahoma" pad;
Saturday, May 20, 2017: 67 for the month; 105 for the quarter.
None.

Friday, May 19, 2017: 67 for the month; 105 for the quarter.
  • 32454, 3,726, MRO, Garness USA 31-4TFH-2B, Antelope-Sanish, t7/17; cum 344K 3/19;
  • 32455, 4,912, MRO, Cunningham USA 31-4H, Antelope-Sanish, t8/17; cum 391K 3/19;
Thursday, May 18, 2017: 65 for the month; 103 for the quarter.
  • 29600, 299 (no typo), Lime Rock Resources, Kenneth Stroh 3-12-1H-143-97, Cabernet, producing, a half-dozen or so Stroh wells came off-line 4/17; it is amazing how much better the Stroh wells are now that OXY USA is no longer in the picture; truly amazing, 21 states; 2.7 million lbs; t11/16; cum 102K 3/19;
  • 32453, 3,396, MRO, Marcella USA 21-4TFH, Antelope,Sanish, 7/17; cum 245K 3/19; 
  • 32503, 1,282, HRC, Fort Berthold 147-94-1A-12-11H, McGregory Buttes, 34 stages, 5.1 million lbs, t12/16; cum 91K 3/17;
Wednesday, May 17, 2017: 62 for the month; 100 for the quarter.

32452, 3,004, MRO, Grady USA 21-14H, Antelope, Sanish, t8/17; cum 237K 5/18;

Tuesday, May 16, 2017
: 61 for the month; 99 for the quarter.

32723, 552, BR, Remington 3E MBH, Blue Buttes, t7/17; cum 282K 5/18;
 
Monday, May 15, 2017
: 59 for the month; 98 for the quarter.
29190, 622, EOG, Parshall 406-34H, Parshall, 21 stages, 5.05 million lbs;  t11/16; cum 42K 3/17; (17580: see this post)
30134, 3,503, MRO, Rough Coulee USA 24-22TFH, Antelope, Sanish, t1/18; cum 183K 5/18; see this post;

Sunday, May 14, 2017
7: 57 for the month; 96 for the quarter.
28946, 1,104, Petro-Hunt, Kostelnak 145-97-32D-29-4H, Little Knife, t1/18; bcum 45K 5/18;
30135, 4,881, MRO, Deane USA 24-22H, Antelope, Sanish, t12/17; cum 290K 3/19; see this post;
32722, 533, BR, Remington 3D UTFH, Blue Buttes, t7/17; cum 270K 5/18;

Saturday, May 13, 2017
: 54 for the month; 93 for the quarter.
30131, 2,420, MRO, Blue Creek USA 24-22TFH-2B, Antelope, Sanish, t1/18; cum 78K 5/18; 

Friday, May 12, 2017: 53 for the month; 92 for the quarter.
25411, 732, QEP, MHA 4-10-15H-149-91, Heart Butte, Three Forks, 43 stages; 9.1 million lbs; (25414, 25413); t2/17; cum --
25412, 903, QEP, MHA 2-10-15H-149-91, Heart Butte, 43 stages, 8.1 million lbs, (25414, 25413); t2/17; cum --
30133, 4,855, MRO, Veronica USA 14-22TFH, Antelope, t12/17; cum 243K 3/19; see this post;


Thursday, May 10, 2017: 50 for the month; 89 for the quarter.
30488, 4,144, MRO, TAT USA 14-22H, Antelope, Sanish, t12/17; cum 190K 5/18; see this post

Wednesday 10, 2017: 49 for the month; 88 for the quarter.
None.

Tuesday, May 9, 2017: 49 for the month; 88 for the quarter.
31992, 847, Oasis, Rolfson S 5198 12-29 8T, Siverston, Three Forks 1st Bench, 36 stages, 4.1 million lbs, t11/16; cum 116K 3/17;
32504, 1,576, HRC, Fort Berthold 148-94-1A-12-11H, McGregory Buttes, 33 stages, 4.9 million lbs, t12/16; cum 88K 3/17;
32993, 102, Petro Harvester, PTL1 05-08 163-91 B, Portal, a Madison well, t3/17; cum 1.5K after 29 days;

Monday, May 8, 2017: 46 for the month; 85 for the quarter.
29126, 955, EOG, Parshall 402-3534H, Parshall, 24 stages, 6.7 million lbs; t11/16; cum 94K 5/18; for more on this area, see "well of interest"
29127, 1,584, EOG, Parshall 401-3534H, Parshall, 2 sections, 18 stages, 5.2 million lbs, t11/16; cum 76K 5/18; for more on this area, see "well of interest"
30241, 2,614, Bruin/HRC, Fort Berthold 152-93-7C-6-13H, Antelope, 35 stages; 5.3 million lbs, t12/16; cum 250K 5/18; see "well of interest"
32482, 1,120, Hess, BB-Chapin A-151-95-0403H-2, Blue Buttes, t5/17; cum 164K 5/18;
32506, 1,588, Bruin/HRC, Fort Berthold 148-94-36D-25-10H, McGregory Buttes, 33 stages, 5 million lbs, t12/16; cum 98K 3/17;

Sunday, May 7, 2017: 41 for the month; 80 for the quarter.
30245, 1,588, Bruin/HRC, Fort Berthold 152-93-7C-6-13H, Four Bears, 36 stages, 5.4 million lbs, t11/16; cum 64K 3/17;
32483, 1,221, Hess, BB-Chapin A-151-95-0403H-3, Blue Buttes, t4/17; cum 141K 5/18;

Saturday, May 6, 2017: 39 for the month; 78 for the quarter.
28470, 1,374, Lime Rock Resources, Matthew Schmidt 4-2-35H-143-97, Cabernet, 35 stages, 4.5 million lbs, (22918, 18427 - no bump in production); t11/16; cum 54K 2/17; went off-line all of 3/17;
30242, 2,324, Bruin/HRC, Fort Berthold 152-93-7C-6-12H, Antelope, 35 stages, 5.3 million lbs, t12/16; cum 78K 3/17;
30246, 2,480, Bruin/HRC, Fort Berthold 152-93-7C-6-8H, Four Bears, t11/16; cum 210K 11/18;
31991, 1,311, Oasis, Rolfson S 5198 12-29 7B, Siverston, 36 stages, 4.1 million lbs, t11/16; cum 156K 3/17;
32484, 1,213, Hess, BB-Chapin A-151-95-0403H-4, Blue Buttes, t5/17; cum 160K 5/18;

Friday, May 5, 2017: 34 for the month; 73 for the quarter.
29103, 780, EOG, Parshall 403-3534H, Parshall, Bakken, 27 stages, 7.3 million lbs, t11/16; cum 45K 3/17;
29104, 1,221, EOG, Parshall 404-3534H, Parshall, Bakken, 22 stages, 5.8 million lbs, t11/16; cum 43K 3/17;
29105, 953, EOG, Parshall 405-3534H, Parshall, Bakken, 21 stages, 5.7 million lbs, t11/16; cum 49K 3/17;
30872, 526, BR, Saddle Butte 21-16 MBH -3SH, North Fork, t6/17; cum 198K 5/18;
32485, 1,016, Hess, BB-Chapin A-151-95-0403H-5, Blue Buttes, t5/17; cum 136K 5/18;

Thursday, May 4, 2017: 29 for the month; 68 for the quarter.
29878, 1,597, WPX, Etstatis 32-29HS, Eagle Nest, t6/17; cum 185K 5/18;
29879, 2,038, WPX, Etstatis 32-29HB, Eagle Nest, t6/17; cum 249K 5/18;
30243, 2,634, HRC, Fort Berthold 152-93-7C-6-11H, Four Bears, 36 stages, 5.5 million lbs; , t12/16; cum 90K 3/17;
30871, 284, BR, Curtis 21-16 TFH-3NH, North Fork, t6/17; cum 366K 11/18;
31990, 1,216, Oasis, Rolfson S 5198 12-29 6T, Siverston, Three Forks First Bench, 36 stages, 4.1 million lbs, t11/16; cum 121K 3/17;
Wednesday, May 3, 2017: 24 for the month; 63 for the quarter.
29880, dry, WPX, Etstatis 32-29HA, Eagle Nest, completed 2/17;
30247, 2,050, HRC Fort Berthold 152-93-7C-6-7H, Four Bears, 36 stages, 5.4 million lbs, t11/16; cum 187K 111/8;
30870, 342, BR, Saddle Butte 21-16 TFH-2SH, North Fork, t7/17; cum 256K 5/18;
32133, 885, BR, CCU Atlantic Express 42-19MBH, Corral Creek, t4/17; cum 264K 5/18;
32486, 1,376, Hess, BB-Chapin A-151-95-0403H-6, Blue Buttes, 65 stages; 4.6 million lbs, t5/17; cum 240K 3/19;
32667, SI/NC, Petro-Hunt/SM Energy, Steen 16-20HN, Ambrose, no production data,

Tuesday, May 2, 2017: 18 for the month; 57 for the quarter.
29881, 2,016, WPX. Etstatis 32-29H, Eagle Nest, t11/16; cum 247K 5/18;
30244, 2,251, HRC, Fort Berthold 152-93-7C-6-10H, Four Bears, Three Forks, 37 stages, 5.6 million lbs;
30869, 582, BR, Curtis 21-16 MBH-2NH, North Fork, t7/17; cum 188K 5/18;
31989, 1,658, Oasis, Rolfson S 5198 12-29 5B, Siverston, 36 stages; 4.1 million lbs, t11/16; cum 151K 2/17;
32134, 766, BR, CCU Atlantic Express 42-19 TFH, Corral Creek, t4/17; cum 155K 5/18;
32668, TASC, Petro-Hunt/SM Energy, Edna Marie 16B-20HN, Ambrose, no production data,
33126, 212, North Range Resources, Sheep Creek Storm 1-IV, Grassy Butte, a DUPEROW well, t12/16; cum 29K 5/18;

Monday, May 1, 2017: 11 for the month; 50 for the quarter.
29882, 1,886, WPX, Etstatis 32-29HW, Eagle Nest, t6/17; cum 331K 3/19;
30248, 2,101, HRC, Fort Berthold 152-93-7C-6-6H, Four Bears,
31189, 1,308, WPX, Poplar 32-29HE, Eagle Nest, t5/17; cum 229K 5/18;
31970, 2,125, Oasis, Rolfson S 5198 11-29 3BX, Siverston, t11/16; cum 328K 3/19;
31971, 2,372, Oasis, Rolfson S 5198 11-29 4T, Siverston, t10/16; cum 209K 3/19;
32135, 275, BR, CCU Pacific Express 42-19 MBH, Corral Creek, t4/17; cum 218K 5/18;
32136, 501, BR, CCU Pacific Express 42-19 TFH, Corral Creek, t4/17; cum 129K 5/18; off-line as of 12/17;
32579, 2,135, HRC, Fort Berthold 152-93-7C-6-5H, Four Bears,
32669, TASC,  Petro-Hunt/SM Energy, Sophus 16-20HS, Ambrose, no production data,
32687, 1,673, WPX, Grizzly 24-13HW, Spotted Horn, no production data,
32721, 576, BR, Remington 3C MBH, Blue Buttes, t7/17; cum 255K 5/18;

Sunday, April 30, 2017: 39 for the month; 39 for the quarter.
  • 31969, 1,353, Oasis, Rolfson S 5198 11-29 2TX, Siverston, t11/16; cum 345K 5/22;
  • 32635, 476, BR, Anderson Ranch 3A-MBH, Camel Butte, t5/17; cum 282K 5/18; cum 428K 5/22; off line 5/22;
  • 32683, 2,198, WPX, Grizzly 24-13HA, Spotted Horn, t3/17; cum 558K 5/22;
Saturday, April 29, 2017: 37 for the month; 37 for the quarter.
  • 32628, SI/NC-->540, BR, Anderson Ranch 3B-TFH, Camel Butte, t5/17; cum 552K 3/22; off line 4/22;
  • 32670, TA/SC, SM Energy, Stella 16B-20HS, Ambrose, no production data, still TASC, 7/22;
Friday, April 28, 2017: 35 for the month; 35 for the quarter.
  • 32580, 1,003, HRC, Fort Berthold 152-93-7C-6-14H, Four Bears, Three Forks, 35 stages, 5.1 million lbs, t11/16; cum 56K 3/17;
  • 32627, 415, BR, Anderson Ranch 3C-MBH, t5/17; cum 208K 5/18;
  • 32684, 2,695, WPX, Grizzly 24-13HG, Spotted Horn, t3/17; cum 387K 11/18;
Thursday, April 27, 2017: 32 for the month; 32 for the quarter.
  • 32626, 590, BR, Blegen Ranch 3D TFH-ULW, Camel Butte, t5/17; cum 235K 5/18;
Wednesday, April 26, 2017: 31 for the month; 31 for the quarter.
  • 31761, 736, Hess, HA-State-LW-152-95-1621H-1, Hawkeye, t5/17; cum 115K 5/18;
Tuesday, April 25, 2017: 30 for the month; 30 for the quarter.
  • 31762, 758, Hess, HA-State-152-95-162H-9, Hawkeye, t5/17; cum 194K 11/19;
Monday, April 24, 2017: 29 for the month; 29 for the quarter.
  • 25873, 645, Slawson, Pike Federal 5-3-2TFH, Big Bend, t9/17; cum 262K 11/19;
  • 31763, 1,489, Hess, HA-State-152-95-162H-8, Hawkeye, t4/17; cum 295K 11/19;
  • 32401, 1,260, QEP, Tipi V 3-13-12BH, Spotted Horn, 54 stages, 10 million lbs, t11/16; cum 253K 11/19;
  • 32402, 1,140, QEP, Tipi V 2-13-12TH, Spotted Horn, Three Forks, 54 stages, 9.7 million lbs, t11/16; cum 172K 11/19;
  •  32403, 1,988, QEP, Tipi V 4-13-12BH, Spotted Horn, 51 stages, 10 million lbs, t12/16; cum 255K 11/19;
  • 32404, 1,189, QEP, Tipi V 3-13-12T2H, Spotted Horn, Three Forks second bench, 51 stages, 9.6 million lbs, t11/16; cum 109K 11/19;
  • 32405, 707, QEP, Tipi V 5-13-12BH, Spotted Horn, middle Bakken, 51 stages, 10 million lbs, t11/16; cum 198K 11/19;
  • 32406, 836, QEP, Tipi V 5-13-12TF, Spotted Horn, 51 stages, 10 million lbs, t10/16; cum 93K 11/19;
  • 32992, 215, Petro Harvester, PTL1 32-29 164-91 B, Portal, a Madison well, 12 stages, 1.2 million lbs, t3/17; cum 56K 11/19;
Sunday, April 23, 2017: 21 for the month; 21 for the quarter.
  • 23910, 820, Slawson, Pike Federal 2-3-2H, Big Bend, t9/17; cum 256K 11/19; cum 312K 5/22;
  • 31764, 829, Hess, HA_State-152-95-1621H-7, Hawkeye, t5/17; cum 207K 11/19; cum 250K 5/22;
Saturday, April 22, 2017: 19 for the month; 19 for the quarter.
  • 31765, 847, Hess, HA-State-152-95-1621H-6, Hawkeye, t4/17; cum 274K 11/19; cum 308K 5/22;
Friday, April 21, 2017: 18 for the month; 18 for the quarter.
  • 22497, 173, Crecent Point, CPEUSC Fairholm 2-34-33-164N-110W, West Ambrose, t2/17; cum 136K 11/19; cum 171K 5/22;
  • 25874, 1,505, Slawson, Pike Federal 4-3-2TFH, Big Bend, t9/17; cum 232K 7/19; remains off line 11/19; cum 420K 5/22;
Thursday, April 20, 2017: 16 for the month; 16 for the quarter.
  • 9762, PA/active-re-entry; no new data, North Range Resources, Sheep Creek Storm 2-1, Grassy Butte; first produced January, 1983; last production, April, 1986; now confidential again; no sundry forms since July 16, 1960; North Range has ten (10) permits/wells as of April, 2017; the two Sheep Creek Storm wells are on confidential status; five Placed wells have been discussed to some degree previously (one PNC; two on drl status; two confidential; all five in Rough Rider; all five vertical wells; #9762, a Madison well; cum 34K 4/86;
  • 31766, 1,296, Hess, HA-State-152-95-1621H-5, Hawkeye, t4/17; cum 328K 11/19; cum 412K 5/22;
Wednesday, April 19, 2017: 14 for the month; 14 for the quarter.
  • 22496, 148, Crescent Point Energy, CPEUSC Aldag 2-35-36-164N-100W, West Ambrose, 4 sections, t2/17; cum 2K over first 28 days, target: upper and middle Three Forks formation; 100% within the TF; 70.5% within the 10' target interval; 3.1% above the target interval; 26.4% below the 10' target interval; cum 116K 11/19; cum 163k 5/22;
Tuesday, April 18, 2017: 13 for the month; 13 for the quarter.
  • 32833, 3,058, Whiting, Wold 16-7TFH, Banks, 4 sections, 35 stages, 7.25 million lbs, t10/16; cum 216K 11/19; ; (19468: link here), See this post. Cum 241K 5/22; struggling.
Monday, April 17, 2017: 12 for the month; 12 for the quarter.
  • 28945, 589, Petro-Hunt, Kostelnak 145-97-32D-29-3H, Little Knife, t1/18; cum 133K 11/19; cum 201K 5/22;
Sunday, April 16, 2017: 11 for the month; 11 for the quarter.
  • None.
Saturday, April 15, 2017: 11 for the month; 11 for the quarter.
  • None.
Friday, April 14, 2017: 11 for the month; 11 for the quarter.
  • None.
Thursday, April 13, 2017: 11 for the month; 11 for the quarter.
  • 31112, 2,401, Whiting, Chameleon State 31-16-1H, Banks, t10/16; cum 255K 11/19; (19859, 22621); see also this link; and this link; cum 304K 5/22;
Wednesday, April 12, 2017: 10 for the month; 10 for the quarter.
  • 32559, 1,416, Whiting, Flatland 43-9HU, Banks, 4 sections, 35 stages, 9.6 million lbs, t10/16; cum 221K 11/19; cum 263K 5/22;
Tuesday, April 11, 2017: 9 for the month; 9 for the quarter.
  • 32562, 1,385, Whiting, Flatland 43-9H-1XH, Banks, 35 stages; 9.8 million lbs, t10/16; cum 335K 11/19; cum 388K 5/22
Monday, April 10, 2017: 8 for the month; 8 for the quarter.
  • 32764, 2,043, Whiting, Chameleon State 31-16HU, Banks, frack data not posted yet, 4 sections, t10/16; cum 185K 11/19; cum 225K 5/22;
Sunday, April 9, 2017: 7 for the month; 7 for the quarter.
  • None.
Saturday, April 8, 2017: 7 for the month; 7 for the quarter.
  • 32560, 1,385, Whiting, Flatland 43-9-2H, Banks, 35 stages, 7.5 million lbs, t10/16; cum 223K 11/19; cum 258K 5/22;
  • 32561, 2,370, Whiting, Flatland 43-9-1H, Banks, frack data not posted yet,  t10/16; cum 229K 11/19; cum 271K 5/22;
Friday, April 7, 2017: 5 for the month; 5 for the quarter.
  • None.
Thursday, April 6, 2017: 5 for the month; 5 for the quarter.
  • 26279, 1,075, Enerplus/Bruin/HRC, Fort Berthold 148-94-36C-25-4H,  McGregory Buttes, t5/17; cum 146K 11/19; cum 173K 5/22;
  • 32756, 1,025, XTO Bear Creek 31X-3F2, Bear Creek, t5/18; cum 123K 11/19; cum 232K 5/22;
  • 33042, 8 (no typo), North Range Resources, Placid 28-2V, Rough Rider, t1/18; cum 373 bbls; Madison, dry; appear to be trying to salvage the Bakken; a directional well; cum 82 bbls 5/22;
  Wednesday, April 5, 2017: 2 for the month; 2 for the quarter.
  • 26281, 2,009, HRC, Fort Berthold 148-94-36C-25-5H, McGregory Buttes, t7/10; cum 251K 11/19; (#18332 -- no bump; cum 438K 11/19); cum 302K 5/22;
Tuesday, April 4, 2017: 1 for the month; 1 for the quarter. 
  • None.
Monday, April 3, 2017: 1 for the month; 1 for the quarter. 
  • 32330, 1,008, BR, CCU Dakotan 8-2-16 TFH, t3/17; cum 217K 11/19;  (30092, 30091, 30090, 30089); cum 317K 5/22;
 Sunday, April 2, 2017: 0 for the month; 0 for the quarter. 
  • None. 
  Saturday, April 1, 2017: 0 for the month; 0 for the quarter.
  • None. 

No comments: