Friday, May 30, 2025

New DOE Supercomputer Announced -- Doudna -- Contractors: Nvidia, Dell -- May 30, 2025

Locator: 48726NVIDIA.


Supercomputers are tracked here.

Reuters, link here.

From one of the stories:

A new supercomputer named after a winner of the Nobel Prize in chemistry will help power artificial intelligence technology and scientific discoveries from the Lawrence Berkeley National Laboratory, federal officials said Thursday.

U.S. Energy Secretary Chris Wright announced the project Thursday alongside executives from computer maker Dell Technologies and Nvidia CEO Jensen Huang.

The new computing system at the Berkeley Lab will be called Doudna after Berkeley professor and biochemist Jennifer Doudna, who won a Nobel in 2020 for her work on the gene-editing technology CRISPR. It’s due to switch on next year.

“One of the key use cases will be genomics research,” said Dion Harris, a product executive in Nvidia’s AI and high-performance computing division, in an interview. “It was basically just a nod to her contributions to the field.”

Dell is contracted with the energy department to build the computer, the latest to be housed at Berkeley Lab’s National Energy Research Scientific Computing Center. Previous computers there have been named after other Nobel winners: Saul Perlmutter, an astrophysicist, and Gerty Cori, a biochemist.

From ChatGPT:

The upcoming “Doudna” supercomputer, named after Nobel laureate Jennifer Doudna for her pioneering work on CRISPR gene-editing, is set to be deployed in 2026 at the Lawrence Berkeley National Laboratory’s National Energy Research Scientific Computing Center (NERSC) in California. This advanced system is a collaborative effort between the U.S. Department of Energy, Nvidia, and Dell Technologies.

Key Specifications and Features:

  • Hardware Components:

    • Equipped with Nvidia’s latest “Vera Rubin” chips, designed to enhance performance in artificial intelligence (AI) and high-performance computing (HPC) tasks.

    • Integrated into Dell’s liquid-cooled servers, ensuring efficient thermal management and energy consumption.

  • Research and Application Focus:

    • Aims to support a wide array of scientific research areas, including genomics, chemistry, physics, and biology.

    • Will serve approximately 11,000 researchers, facilitating advancements in both fundamental science and national security applications, such as the maintenance of the U.S. nuclear arsenal. 

  • Naming Tradition:

    • Continues NERSC’s tradition of naming supercomputers after Nobel laureates, following predecessors like “Perlmutter” and “Cori.” 

While specific performance metrics, such as processing power and storage capacity, have not been publicly disclosed, the integration of cutting-edge Nvidia chips and Dell’s advanced server technology suggests that Doudna will be among the leading supercomputers upon its deployment.

For comparison, NERSC’s current supercomputer, Perlmutter, features a heterogeneous architecture with Nvidia A100 GPUs and AMD Milan CPUs, delivering significant computational capabilities for a variety of scientific applications. 

The Doudna supercomputer is anticipated to play a pivotal role in accelerating scientific discoveries and technological innovations across multiple disciplines. 

Cost? From ChatGPT, again: 

While the exact cost remains unspecified, we can look to previous NERSC supercomputers for context. For instance, the Perlmutter supercomputer, delivered in 2020, had a total contract value of $146 million, which included multiple years of service and support.  Given the advancements in technology and the scale of the Doudna project, it’s reasonable to anticipate that its cost could be in a similar range or potentially higher.

My hunch: 50% higher --> $220 million.  

Top 500 supercomputers, link here.

From wiki, Perlmutter supercomputer:

Perlmutter (also known as NERSC-9) is a supercomputer delivered to the National Energy Research Scientific Computing Center of the United States Department of Energy as the successor to Cori.
It is being built by Cray and is based on their Shasta architecture which utilizes Zen 3 based AMD Epyc CPUs ("Milan") and Nvidia Tesla GPUs.
Its intended use-cases are nuclear fusion simulations, climate projections, and material and biological research. Phase 1, completed May 27, 2022, eached 70.9 PFLOPS of processing power.
It is named in honor of Nobel prize winner Saul Perlmutter.

Midday News -- Monthly Utility Bill -- Personal Electricity -- Texas: Hittig On All Cylinders -- Ft Worth To Get New US Army Helicopter Program -- A $70 Billion Line Item Expense -- May 30, 2025

Locator: 48725TEXAS.

Boston: ICE raid. Will be updated elsewhere. Strange. Limited reporting. 

Ft Worth: new helicopter. See below. The Blackhawk program was headquartered / built in Stratford, CT. The new US Army helicopter to be manufactured by Bell in Ft Worth. Texas: hitting on all cylinders.

Berkeley: new DOE supercomputer -- Nvidia and Dell. Updated elsewhere.

Moscow: Microsoft unit declares bankruptcy. A most bizarre story.

*************************
US Army Helicopter

New:

Valor, the MV-75 helicopter, officially known as the Bell V-280 Valor, is being developed and manufactured by Bell Textron, an American aerospace company headquartered in Fort Worth, Texas.
Bell Textron is a subsidiary of Textron Inc. and operates manufacturing facilities in Fort Worth and Amarillo, Texas, where military rotorcraft are produced.
The MV-75 is a tiltrotor aircraft designed to replace the UH-60 Black Hawk helicopter in the U.S. Army's fleet. It combines vertical takeoff and landing capabilities with the speed and range of a fixed-wing aircraft.
The aircraft is powered by two Rolls-Royce turboshaft engines and is intended for various missions, including air assault, medical evacuation, and combat search and rescue.
The MV-75 is part of the U.S. Army's Future Vertical Lift modernization program, with initial flight tests planned for 2026 and full deployment expected by 2030.
The 101st Airborne Division at Fort Campbell, Kentucky, is set to be the first unit to receive the aircraft.
From ChatGPT: $70 billion over the course of the lifetime of this program.

Old:

The Black Hawk helicopter, formally known as the Sikorsky UH-60 Black Hawk, was and is manufactured by Sikorsky Aircraft, a division of Lockheed Martin since 2015.
Originally, Sikorsky Aircraft was an independent company based in Stratford, Connecticut, which is where the primary manufacturing of the Black Hawk has historically taken place.
Key Manufacturing Details:
Primary Manufacturing Location: Stratford, Connecticut (Sikorsky Aircraft headquarters and main production plant)
Additional Assembly Locations: West Palm Beach, Florida:
Some assembly and flight test operations. Collaborative international partners have produced variants or parts under license, such as in Poland (PZL Mielec) and Turkey (TAI). The UH-60 first entered service in 1979 and remains one of the most widely used utility helicopters in the world.

************************************
Personal Electricity Bill

Our monthly utility bill arrived today. We only have electricity, no natural gas.

Up until about two years ago, I worked very, very hard at conserving electricity. No longer. About a year and a half ago, except for drying clothes at peak energy demand in the summer, I no longer care about our use of electricity. As a wag, I suppose, our monthly electricity bills have increased about 10%. An average "shoulder" month (spring, autumn) probably went from around $85 to $95? 

This past month, April/May was a very nice month. The average temperature this past month was 82°F. Last year, same month, the average temperature was 84°F. 

Our daily use remained about the same, m/m and y/y:  average daily usage, kWh, 18 - 19 kWh. 

Last year, 2024: $89.95. So, no increase y/y. Wow.

Most recent bill:


Slawson Gunslinger Production Data Updated -- May 30, 2025

Locator: 10010GUNSLINGER.

Updates

October 20, 2021: production data updated.

Original Post

Note:

  • 33625: 351K in less than 20 months; still producing 15,000 bbls/31 days; cum 490K 8/21;
  • 33625: note the "chronologic number" -- #12
The wells, a 10-well pad, from the south, running north:
  • 36363, PNC, Slawson, Gunslinger ....1TFH, Sand Creek,
  • 36362, 1,482, Slawson, Gunslinger ....1H, Sand Creek, t4/21; cum 129K 8/21; cum 447K 3/25;
  • 36361, PNC, Slawson, Gunslinger ....1TF2H, Sand Creek,
  • 36360, 1,510, Slawson, Gunslinger ....1TFH, Sand Creek, t4/21; cum 91K 8/21; cum 216K 3/25;
  • 36359, PNC, Slawson, Gunslinger ....1TF2H, Sand Creek,
  • 36358, 1,457, Slawson, Gunslinger ....1H, Sand Creek, t4/21; cum 127K 8/21; cum 304K 3/25;
  • 36357, 1,242, Slawson, Gunslinger ....1TFH, Sand Creek, t4/21; cum 92K 8/21; cum 181K 3/25;
  • 36356, 1,817, Slawson, Gunslinger ....1H, Sand Creek, t4/21; cum 116K 8/21; cum 244K 3/25;
  • 36355, PNC, Slawson, Gunslinger ....1TF2H, Sand Creek,
  • 36354, 1,904, Slawson, Gunslinger ....1TFH, Sand Creek, t3/21; cum 87K 8/21; cum 179K 3/25;

From the north, running south:
  • 33626, PNC, Slawson, Gunslinger ....1TF2H, Sand Creek,
  • 33625, 1,433, Slawson, Gunslinger Federal 4-1-12H, Sand Creek, t2/18; cum 351K 10/19; went off line 10/19; back on line 2/21; cum 490K 8/21; cum 588K 3/25;
  • 33624, 877, Slawson, Gunslinger Federal 7-1-12TFH, t2/21; cum 123K 8/21; cum 201K 3/25;
  • 33623, 772, Slawson, Gunslinger ....12H, Sand Creek, t12/20; cum 144K 8/21; cum 227K 3/25;
  • 33621, 2,070, Slawson, Gunslinger ....12TFH, Sand Creek, t11/20; cum 182K 8/21; cum 266K 3/25;
  • 33622, PNC, Slawson, Gunslinge Federal 16-1-12TF2H, Sand Creek, 
For newbies:
  • "H": middle Bakken
  • TFH: Three Forks, first bench
  • TF2H: Three Forks, second bench
Of the sixteen Gunslinger Federal permits (one now canceled):
  • middle Bakken: 5
  • Three Forks, first bench: 6
  • Three Forks, second bench: 5 (one now canceled)
Graphics:


CLR Gibb Wells Production Updated -- May 30, 2025

Locator: 10010GIBB.

The wells:

  • 24352, 287, CLR, Gibb 1-24H, 30 stages, 3 million lbs, Beaver Lodge, t3/13; cum 142K 10/20; off line 9/24; cum 190K 9/24;
  • 37485, loc/A, CLR, Gibb 2-24HSL1, Beaver Lodge, t3/24; cum 149K 3/25;
  • 37486, loc/A, CLR, Gibb 3-24H, Beaver Lodge, t2/24; cum 152K 3/25;
  • 37487, loc/A, CLR, Gibb 4-24H1, Beaver Lodge, t2/24; cum 137K 3/25;
  • 37488, conf, CLR, Gibb 5-24H, Beaver Lodge,
  • 37489, PNC, CLR, Gibb 6-24H1, Beaver Lodge,
  • 37490, PNC, CLR, Gibb 7-24H, Beaver Lodge,
  • 37491, PNC, CLR, Gibb 11-24HSL, Beaver Lodge,
  • 37492, PNC, CLR, Gibb 10-24H1, Beaver Lodge,
  • 37493, PNC, CLR, Gibb 9-24H, Beaver Lodge,
  • 37494, PNC, CLR, Gibb 8-24H1, Beaver Lodge,
Current area:

*********************** 

Stayin' Alive, Bee Gees

Enerplus Heavy Metal Pad #1 Production Updated -- May 30, 2025

Locator: 10010METAL1.
The Wells
 
The wells:
  • 33967, 3,162, Enerplus, Cobalt 147-93-09D-04H, Moccasin Creek, t7/18; cum 421K 10/22; cum 475K 1/24; cum 495K 3/25;
  • 33968, 932, Enerplus, Nickel 147-93-16B-21H-TF, Moccasin Creek, t8/18; cum 250K 10/22; cum 282K 1/24; cum 301K 3/25;l
  • 33969, 1,077, Enerplus, Steel 147-93-09D-04-TF, Moccasin Creek, t8/18; cum 315K 10/22; cum 354K 1/24; cum 368K 3/25;
  • 33970, 2,038, Enerplus, Tungsten 147-93-16A-21H, Moccasin Creek, t7/18; cum 340K 10/22; cum 387K 1/24; cum 409K 3/25;
  • 33971, 2,631, Enerplus, Zinc 147-93-09D-04H, Moccasin Creek, t7/18; cum 370K 10/22; cum 403K 1/24; cum 417K 3/25;
  • 33972, 1,126, Enerplus, Lead 147-93-16B-21H-TF, Moccasin Creek, t7/18; cum 317K 10/22; cum 378K 1/24; cum 402K 3/25;
  • 37583, PNC, Enerplus, Beryllium 147-93-09D-04H, Moccasin Creek, t--; cum,
  • 33974, loc/drl, Enerplus, Silver 147-93-09D-04H, Moccasin Creek, t7/24; cum 87K 3/25;3
  • 37584, loc/drl, Enerplus, Niobium 147-93-09D-04H, Moccasin Creek, t10/24; cum 46K 3/25;
  • 33973, loc/A, Enerplus, Titanium 147-93-16A-21H, Moccasin Creek, t7/24; cum 96K 3/25;
  • 37585, loc/A, Enerplus, Yttrium 147-93-16A-21H, Moccasin Creek, t6/24; cum 212K 3/25;
  • 33975, PNC, Enerplus, Platinum 147-93-16A-21H, Moccasin Creek, t--; cum
  • 37586, PNC, Enerplus, Cesium 147-93-16A-21H-LL, Moccasin Creek, t--; cum --;
Updates

December 27, 2022: maps updated -- 


May 19, 2020: see this post for more information on the new Enerplus "Lithophile Element" pad.

The graphic:


The arrow points to the proposed area for Enerplus "Lithophile Element" pad.


Original Post
The graphic:


Enerplus' "heavy metal" pad:
  • 33967, 3,162, Enerplus, Cobalt 147-93-09D-04H, Moccasin Creek, t7/18; cum 353K 12/20; cum 398K 4/22;

    DateOil RunsMCF Sold
    10-20182533019107
    9-2018284944887
    8-2018508112650
    7-2018226302650

  • 33968, 932, Enerplus, Nickel 147-93-16B-21H-TF, Moccasin Creek, 33 stages; 5.9 million lbs, t8/18; cum 222K 12/20; cum 236K 4/22;

    PoolDateDaysBBLS OilRunsBBLS WaterMCF ProdMCF SoldVent/Flare
    BAKKEN10-2018301755417484198171228767964413
    BAKKEN9-2018221999220032207661399492474094
    BAKKEN8-201831282922795838928198055819746
    BAKKEN7-20181236226349316558106
    BAKKEN6-20181600000

  • 33969, 1,077, Enerplus, Steel 147-93-09D-04H-TF, Moccasin Creek, t8/18; cum 260K 12/20; cum 291K 4/22;

    DateOil RunsMCF Sold
    10-20181727613032
    9-2018264424535
    8-201835723108
    7-2018923108

  • 33970, 2,038, Enerplus, Tungsten 147-93-16A-21H, Moccasin Creek, t7/18; cum 282K 12/20; cum 318K 4/22;

    DateOil RunsMCF Sold
    10-2018207598070
    9-20182618912090
    8-2018476934504
    7-2018175344504

  • 33971, 2,631, Enerplus, Zinc 147-93-09D-04H, Moccasin Creek, t7/18; cum 332K 12/20; cum 358K 4/22;

    DateOil RunsMCF Sold
    10-20182995422595
    9-2018289464965
    8-2018503561622
    7-2018138551622

  • 33972, 1,126, Enerplus, Lead 147-93-16B-21H-TF, Moccasin Creek, t7/18; cum 263K 12/20; cum 295K 4/22;

  • DateOil RunsMCF Sold
    10-2018181457053
    9-20182666812311
    8-2018346311747
    7-201868021747


  • 33973, loc, Enerplus, Titanium 147-93-16A-21H,
  • 33974, loc, Enerplus, Silver 147-93-09D-04H,
  • 33975, loc, Enerplus, Platinum 147-93-16A-21H,