Friday, October 7, 2016

The Oasis Hysted Wells In Camp Oil Field -- October 7, 2016

Updates

May 11, 2019: production numbers updated; it seems these wells should have done better; wait for re-work; re-fracks.

Original Post

Done quickly; not proofread; there will be typographical and factual errors. If this information is important to you, go to the source.

The Hysted wells:
  • 31134, 1,359, Oasis, Hysted 5200 11-30 6B, Camp, 36 stages, 4 million lbs, t3/16; cum 191K 3/19; cum 217K3/22;
  • 31133, 1,547, Oasis, Hysted 5200 11-30 7T, Camp, 36 stages, 4 million lbs, t3/16; cum 182K 3/19; cum 206K 3/22;
  • 31132, 2,157, Oasis, Hysted 5200 11-30 8B, Camp, 36 stages, 3.2 million lbs, t3/16; cum 241K 3/19; cum 278K 3/22;
  • 31131, 1,206, Oasis, Hysted 5200 11-30 9T, Camp, 36 stages, 3.5 million lbs, t3/16; cum 141K 3/19; cum 172K 3/22;
  • 31122, 811, Oasis, Hysted 5200 12030 11T, Camp, t4/16; cum 109K 3/19; cum 135K 3/22;
  • 31121, 1,374, Oasis, Hysted 5200 12-30 10B, Camp 36 stages, 3.0 million lbs, t4/16; cum 222K 3/19; cum 246K 2/22; off line 3/22;
  • 30881, 629, Oasis, Hysted 5201 14-25TX, Camp, 36 stages, 4 .1 million lbs, 4 sections, t3/16; cum 154K 3/19; cum 186K 3/22;
  • 26833, 1,613, Oasis, Hysted 5200 14-30 3T2, Camp, 2nd Bench Three Forks; API 33-053-05419; t41/4; cum 99K 3/19; cum 133K 3/22;
  • 26130, 3,396, Oasis, Hysted 5200 14-30 2B, Camp, t3/14; cum 304K 3/19; cum 358K 3/22;
  • 19844, 1,760, Oasis, Hysted 5200 44-19H, Camp cased hole, 4.1 million lbs, t7/11; cum 276K 3/19; cum 306K 3/22;
Map of the general area:


From the file report for #26833:
  • the Three Forks Formation (Devonian) was reached at 10,982 feet
  • the Three Forks first claystone unit was reached at 11,038 feet
  • the Three Forks second bench (Devonian) was reached at 11,080 feet
  • the target zone of the Three Forks was to be drilled in a predominately dolomite thirteen foot zone beginning 13 feet into the Three Forks second bench
  • low gas pressures in the target zone, with background ranging from 100 to 150 units; connection peaks of 170 to 330 units
From the file report for #26130:
  • the Upper Bakken Shale member (Mississippian-Bakken Formation) was drilled at 10,952 feet; hydrocarbon in this interval reached a maximum of 572 units with a down time gas of 5,931 units
  • the Bakken Middle Member (Mississippian-Devonian) was reached at 11,006 feet; 
  • the target zone of the middle Bakken was to be drilled in a predominately silty sandstone eleven foot zone beginning 14 feet into the middle Bakken
  • gas shows were very high, with trip gases of 5,268; 6,046; 4,666; and 4,621 units respectively
  • opened 10,131' of potentially productive reservoir rock
From the file report of #19844:
  • the third well in a series of wells by Oasis targeting the Three Forks in this area
  • the Bakken Formation was penetrated at 10,827 feet
  • the Middle Bakken at 10,855 feet; 
  • the Lower Bakken Shale was penetrated at 10,922 feet, geology similar to Upper Bakken Shale
  • true thicknesses for the Bakken members are as follows: Upper Bakken, 19 feet; middle Bakken, 40 feet; and, the Lower Bakken Shale, 12 feet
  • the Three Forks Formation was drilled at 10,945 feet
  • background gas generally low, peaking at 739 units; trip gas as high as 774 units
  • well bore maintained with the 25-foot thick target interval for 79% of the total exposed well bore

No comments: