Sunday, December 29, 2019

Re-Frack Data For A CLR Mountain Gap Originally Completed Back In 2008 -- December 29, 2019

See this note for this well.

The well:
  • 17100, 240, CLR, Mountain Gap 31-10H, Rattlesnake Point, t6/08; cum 123K 5/18; cum 471K 10/19;
We now have the re-frack data: 57 stages; 13.93 million lbs; test 3/18:

Production data before/after the re-frack:
BAKKEN9-20183025164252122623631413278813140
BAKKEN8-2018313599735753453744292442309210
BAKKEN7-20183141189414275749245918433442169
BAKKEN6-20183052661527136344257604528864326
BAKKEN5-20181726682264103645028245211007145
BAKKEN4-201856946945436137901379
BAKKEN3-20180000000
BAKKEN2-20180000000
BAKKEN1-20180000000
BAKKEN12-20170000000
BAKKEN11-20170000000
BAKKEN10-20170000000
BAKKEN9-20170000000
BAKKEN8-20170000000
BAKKEN7-20170000000
BAKKEN6-2017221712403388880
BAKKEN5-201731296239371221166

Production following original frack:
BAKKEN12-20083126452442285143014300
BAKKEN11-20082830423128407341634160
BAKKEN10-20083040063566101936453046599
BAKKEN9-2008252005229118717261545181
BAKKEN8-2008313844364352734843319165
BAKKEN7-20083139694095104330202952725
BAKKEN6-200830591456482002390303903
BAKKEN5-20083116002305000

2 comments:

  1. Mamamia! Sophia, call the peak oilers.

    ReplyDelete
    Replies
    1. LOL. I think there's a lot of work left to be done in the Bakken.

      Delete