Saturday, February 28, 2015

Random Look At A Hess Well In Blue Buttes; 50K In One Month -- February 28, 2015

  • 27505, 1,628, Hess, BB-Budahn A-150-95-0403H-6, Blue Buttes oil field, t12/14; cum 55K 12/14; very little water:
PoolDateDaysBBLS OilRunsBBLS WaterMCF ProdMCF SoldVent/Flare
BAKKEN12-20143140279413012937556652622029445
BAKKEN11-201481435913015138910531010531

Other data points:
  • 35 stages; 2.5 million lbs sand
  • Total depth: 21,195
  • Drilling rig: August 24, 2014
  • TD: September 10, 2014
  • Middle Bakken: 10,642' TVD
  • Other geologic markers not yet provided
  • Deepest portion of the curve reaching 10,673' TVD
  • Background gases to 4,417 units early on; later up to 9,272 units;
This is why "anti-collision plans" are required before drilling (this is part of the Blue Buttes oil field):



Zooming in. Note the two 4-wells pad to the north and the six-well pad where the 27505 is sited. Just in this small area of this section, 14 wells are sited.



I track the Hess BB-Budahn wells here.

No comments:

Post a Comment