Monday, February 8, 2021

New Apple Chips -- February 8, 2021

See this note for background.

Bottom line: Apple's new "in-house" semiconductor chip, the Apple M1, is considered the new industry standard. 

But now this. I knew it but had forgotten. 

Link here.

Last November, Apple introduced the world to the Apple M1 chip in its:

  • entry-level 13-inch MacBook Pro;
  • MacBook Air

As "revolutionary" as those chips were and their introduction was, Apple is now raising the bar by putting the new Apple Silicon chips into all 2021 MacBook Pro models. Article linked above.

Amazingly, this "Mac transition to Apple Silicon" already has its own wiki page. From the wiki article:

In June 2020, former Intel principal engineer François Piednoël said Intel's "abnormally bad" quality assurance in its Skylake processors, making Apple "the number one filer of problems in the architecture", helped Apple decide to migrate. Intel CTO Mike Mayberry countered that quality assurance problems may arise at large scale from any CPU vendor.

More:

In June 2020, tech analyst Daniel Newman estimated that Apple accounts for some $1.5 billion to $3.0 billion (about 2% to 4%) of Intel's annual revenue, and only 6.9–12% of the PC market in the United States of America and 7% globally. 

Longer-term speculation holds that the transition could prompt other PC makers to reevaluate their dependence on Intel's x86 architecture, as Macs sometimes set trends in the personal computing industry.

Back to the MacRumors article:

The higher-end MacBook Pro models are highly likely to feature ‌Apple Silicon‌ chips that are more powerful than the ‌M1‌, and Apple is believed to be developing options with as many as 16 power cores and four efficiency cores. Apple is also working on custom GPU technology with 16 and 32-core options, which may be used in the new MacBook Pros.

The new MacBook Pro will also restore a lot of features that had been removed over the years, features that Apple users apparently really missed (previously posted). 

It's my understanding that "Apple Silicon chips" is an umbrellas term for these new chips, including the M1. 

Googling "M2" proved correct.

From February 6, 2021, a tipster suggests: "Apple M1X, M2, A14X, A15, and A15 Bionic lead the speculation for the true identities of four alleged upcoming Apple SoCs." 

From another source, January 28, 2021:

The M1 chip in the MacBook Air base variant comes with seven GPU cores instead of eight. Thanks to the fan, the same M1 on the MacBook Pro with all GPU cores enabled can be slightly more powerful. We can expect the M2 to run alongside the M1 instead of succeeding it in the entire lineup right away. Eventually, we could be looking at both the MacBook Air and MacBook Pros with two processor variants, and then the entire lineup offering the M1 as an entry-level chip, with the M2 delivering higher performance.

So far, reports indicate that the chip will be designed on the same 5nm architecture as the current one. It is expected to give a performance boost to the new Mac lineup that will come with it. The company is apparently planning to increase the number of cores as well. It is reported that Apple M2 specifications for the GPU could go as high as 128 cores. The company is apparently testing chips with 16 or 32 cores already.

Multi-core processors? See wiki. Of course.

For The Archives -- Clearing Out The In-Box -- February 8, 2021

Frigid northeast: ISO New England continues to burn coal and oil -- 

Why Ford and Mercedes are moving to trucks:

New records, from TheWSJ, what's not to like:

The Russell 2000 action today made me think of Sophia this past weekend:

It's hard to see due to my filming, but Sophia gave her dad a head start (on the right). She caught up with him and either beat him by a "hand" or it was a photo-finish tie.

Amazon to buy 1,000 CNG vans:

  • Amazon's orders and deliveries surged in 2020;
  • online retailers sales rose 38% in 2020;
  • plans to run a carbon-neutral business by 2040;
  • engines to be supplied by Cummins Inc and Vancouver-based Westport Fuel Systems, Inc;
  • are to be used for Amazn's heavy-duty trucks that run from warehouses to distribution centers;
  • they can operate on both renewable and no-renewable natural gas;
  • in 2019, Amazon ordered 100,000 electric vans from startup Rivian Automotive LLC; last-mile delivery
    • first of these will be delivered to Amazon this year (2021)
  • the company also ordered 1,800 electric vans from Mercedes-Benz for its European delivery fleet;

 
Amazon moves on its largest renewable project -- off-shore northern Europe
-- link to Julianne Geiger:

  • Hollandse Kust Noord
  • wind farm in the Netherlands, currently be developed by The Crosswind
  • will supply the power through a project known as the Amazon-Shell HKN OffshoreWind Project
  • Crosswind: oil giant Royal Dutch Shell and Mitsubishi subsidiary Eneco
  • completion date: 2023
  • capacity: 759 WM
  • yearly generation: 3.3 TWh
  • project will include a floating solar energy farm; a short-term battery storage (Musk?), turbines programmed not to interfere with each other; and green hydrogen as a storage technique: this Rube Goldberg project all designed to provide more a continuous power supply from a renewable energy source, wind, known for being notoriously sporadic, with huge peaks and valleys;

And, finally, from the UK, hope it was worth it:

Disclaimer: this is not an investment site.  Do not make any investment, financial, job, career, travel, or relationship decisions based on what you read here or think you may have read here.

The CLR Dennis / Flint Chips Wells In Cedar Coulee / Big Gulch

Twelve new permits, #38117 - #38128, inclusive:

  • Operator: CLR
  • Field: Big Gulch (Dunn County), Cedar Coulee (Dunn County)
  • Comments: CLR has four permits for four new wells in another unitized field, the FIU
    • 38117, conf, CLR, Dennis FIU 13-8H1, Cedar Coulee, NWNE 8-147-96, 208 FNL 2054 FEL,
    • 38118, conf, CLR, Dennis FIU 14-8H, Cedar Coulee, NWNE 8-147-96, 241 FNL 2053 FEL,
    • 38119, conf, CLR, Flint Chips Federal 2-5HSL, Big Gulch, NWNE 8-147-96, 274 FNL 2053 FEL,
    • 38120, conf, CLR, Dennis FIU 14-2HSL, Big Gulch, NWNE 8-147-96, 307 FNL 2053 FEL,
    • 38121, conf, CLR, Flint Chips Federal 3-5HSL1, Big Gulch, NWNE 8-147-96, 340 FNL 2053 FEL,
    • 38122, conf, CLR, Dennis FIU 14--5HSL1, Big Gulch, NWNE 8-147-96, 373 FNL 2053 FEL,
    • 38123 conf, CLR, Flint Chips Federal 4-5H, Cedar Coulee, NWNE 8-147-96, 373 FNL 2053 FEL,
    • 38124, conf, CLR, Dennis FIU 4-8H, Cedar Coulee, NWNE 8-147-96, 439 FNL 2053 FEL,
    • 38125, conf, CLR, Flint Chips Federal 5-51, Cedar Coulee, NWNE 8-147-96, 472 FNL 2053 FEL,
    • 38126, conf, CLR, Dennis FIU 5-8H1, Cedar Coulee, NWNE 8-147-96, 505 FNL 2053 FEL,
    • 38127, conf, CLR, Flint Chips FIU 6-5H, Cedar Coulee, NWNE 8-147-96, 538 FNL 2052 FEL,
    • 28128, conf, CLR, Dennis FIU 6-8H, Cedar Coulee, NWNE 8-147-96, 571 FNL 2052 FEL,

Existing well in that drilling unit:

  • 16605, 418, CLR, Dennis 44-8H, Cedar Coulee, t7/07; cum 89K 12/20;

Remote Learning -- Texas Style -- Nothing About The Bakken -- February 8, 2021

I just love this "remote learning." It's the best of "home schooling" and public school.

From 7:40 a.m. to 11:00 a.m., Sophia's mommy and Sophia's older sisters help her with logging on, tracking assignments. From 11:00 a.m. to the end of the day, I have her.

Today, the home / remote learners stopped by the school to pick up their goody bags that they will  have for their class Valentine's party on Friday, February 12, 2021. 

Sophia was so thrilled to pick up her goody bag. She was told not to open it until Friday. LOL. That lasted for less than an hour. 

Picking up her Valentine's goody bag:


 

CLR With 12 New Permits (Though Some May Be Canceled); WTI Closes Above $58 -- February 8, 2012

Markets: all three major indices closed at all-time highs. New numbers to beat?

  • Dow: 31,386
  • S&P 500: 3,916
  • NASDAQ: 13,988

WTI: whoo-hoo! Closes about $58. 

Refiner: update on MPC and Speedway. Archived.

*****************************
Back to the Bakken

Active rigs:

$58.07
2/8/202102/08/202002/08/201902/08/201802/08/2017
Active Rigs1454645737

Twelve new permits, #38117 - #38128, inclusive

  • Operator: CLR
  • Field: Big Gulch (Dunn County), Cedar Coulee (Dunn County)
  • Comments: CLR has four permits for four new wells in another unitized field, the FIU
    • 38117, conf, CLR, Dennis FIU 13-8H1, Cedar Coulee, NWNE 8-147-96, 208 FNL 2054 FEL,
    • 38118, conf, CLR, Dennis FIU 14-8H, Cedar Coulee, NWNE 8-147-96, 241 FNL 2053 FEL,
    • 38119, conf, CLR, Flint Chips Federal 2-5HSL, Big Gulch, NWNE 8-147-96, 274 FNL 2053 FEL,
    • 38120, conf, CLR, Dennis FIU 14-2HSL, Big Gulch, NWNE 8-147-96, 307 FNL 2053 FEL,
    • 38121, conf, CLR, Flint Chips Federal 3-5HSL1, Big Gulch, NWNE 8-147-96, 340 FNL 2053 FEL,
    • 38122, conf, CLR, Dennis FIU 14--5HSL1, Big Gulch, NWNE 8-147-96, 373 FNL 2053 FEL,
    • 38123 conf, CLR, Flint Chips Federal 4-5H, Cedar Coulee, NWNE 8-147-96, 373 FNL 2053 FEL,
    • 38124, conf, CLR, Dennis FIU 4-8H, Cedar Coulee, NWNE 8-147-96, 439 FNL 2053 FEL,
    • 38125, conf, CLR, Flint Chips Federal 5-51, Cedar Coulee, NWNE 8-147-96, 472 FNL 2053 FEL,
    • 38126, conf, CLR, Dennis FIU 5-8H1, Cedar Coulee, NWNE 8-147-96, 505 FNL 2053 FEL,
    • 38127, conf, CLR, Flint Chips FIU 6-5H, Cedar Coulee, NWNE 8-147-96, 538 FNL 2052 FEL,
    • 28128, conf, CLR, Dennis FIU 6-8H, Cedar Coulee, NWNE 8-147-96, 571 FNL 2052 FEL,

Existing well in that drilling unit:

  • 16605, 418, CLR, Dennis 44-8H, Cedar Coulee, t7/07; cum 89K 12/20;

One permit cancelled:

  • Hess: a BL-Frisinger permit in Williams County;

Fourteen permits renewed:

  • CLR (8): eight Gordon Federal permits in Dunn County
  • Petro-Hunt (6): three Jorgenson permits and three Etsby permits, all in section 35-159-94;

Corrections to Daily Activity Report, dated 2/3/21:

Permit cancellations:

  • CLR (4): three Dennis permits and one Flint Chips permit; all in Dunn County (#23001 - #23004, inclusive)

Ten permits renewed:

  • Oasis (4): four Foley Federal permits in McKenzie County;
  • NP Resources (3): three Beaver Creek permits in Billings County
  • Kraken (3): two Wallace permits and one Hokanson permit, all in Williams County