The well:
- 37066, conf-->loc/A, Hess, EN-Labar-154-94-1003H-9, 33-061-04618, Alkali Creek, first production, 8/20; t--; cum 143K 12/20; fracked 5/28/20 - 6/5/20: 6.5 million gallons of water; 83.8% water by mass;
Pool | Date | Days | BBLS Oil | Runs | BBLS Water | MCF Prod | MCF Sold | Vent/Flare |
---|---|---|---|---|---|---|---|---|
BAKKEN | 12-2020 | 31 | 19633 | 19756 | 9187 | 0 | 0 | 0 |
BAKKEN | 11-2020 | 30 | 25572 | 25487 | 9101 | 38279 | 36968 | 1311 |
BAKKEN | 10-2020 | 31 | 26374 | 26456 | 10437 | 42031 | 41469 | 562 |
BAKKEN | 9-2020 | 30 | 30026 | 30017 | 11932 | 47067 | 44685 | 2382 |
BAKKEN | 8-2020 | 24 | 41585 | 41384 | 36422 | 54127 | 34128 | 19999 |
Look at this from the file report:
- spud date: March 1, 2020; serious drilling did not begin until 8:00 a.m., March 3, 2020
- cease drilling: March 8, 2020
- target: middle Bakken
- reached KOP: 10:15 p.m. March 3, 2020 -- 14 hours to drill the vertical
- KOP:
- build began at 9:00 a.m., March 4, 2020
- landed in the middle Bakken; and completed the curve at 5:30 p.m. CT, March 4, 2020; same day
- lateral:
- began at 4:15 a.m., March 6 -- so there was no drilling for a full day (March 5 -- no drilling)
- the center of the ideal geological target area: 30' vertical depth inside the middle Bakken formation;
- overall drilling window had a thickness of 20' with the top of the target window located 20 vertical feet inside the middle Bakken and the base ending at 40' total vertical feet;
- the entire lateral drilled within the target geological area except 270' that was drilled within one foot of the base target location
- as noted, drilled ceased on March 8, 8:10 p.m. CT -- two and a half days to drill the lateral;
- max gas appeared to be 4,024 units;
- TVD: 10,515.86'
- MD: 21,070'