Sunday, July 18, 2021

An Old BR Well Drilled Back In 2011 Jumps 20x In Oil Production -- July 18, 2021

The BR Chuckwagon wells are tracked here.

The well (previously posted but not the full production profile):

A sundry form stating an approximate start date of October 17, 2019:

BR ... requests to re-stimulate[this well]. It is our intent to remove the existing artificial lift equipment, perform a log to confimr 7" casing integrity ... a plug and perf stimulation will be performed, followed by a coil tubing cleanout.

Recent production:

PoolDateDaysBBLS OilRunsBBLS WaterMCF ProdMCF SoldVent/Flare
BAKKEN5-2021163018351858721209889473151
BAKKEN4-20213092458995148694176741619148
BAKKEN3-202124915191771394827001269980
BAKKEN2-2021281182712223164153061730437176
BAKKEN1-20211996259439172662553624909624
BAKKEN12-20204189914315519534753460
BAKKEN11-20201200000
BAKKEN10-20202613747141321899634495034495
BAKKEN9-20202716402162132400937361037361
BAKKEN8-20202311701114942623830070372426346
BAKKEN7-20201100000
BAKKEN6-20200000000
BAKKEN5-20200000000
BAKKEN4-202020052273130313
BAKKEN3-2020187870000
BAKKEN2-20200000000
BAKKEN1-20200000000
BAKKEN12-20191000000
BAKKEN11-20190000000
BAKKEN10-201961284881314700470
BAKKEN9-201930563416563251102511
BAKKEN8-20193175898275428552395460
BAKKEN7-201931805716946388138810


No comments:

Post a Comment

Note: Only a member of this blog may post a comment.