The wells:
- 37066, conf, Hess, EN-Labar-154-94-1003H-9, 33-061-04618, Alkali Creek, fracked 5/28/20 - 6/5/20; 6.5 million gallons of water; 83.8% water by mass;
Date | Oil Runs | MCF Sold |
---|---|---|
11-2020 | 25487 | 36968 |
10-2020 | 26456 | 41469 |
9-2020 | 30017 | 44685 |
8-2020 | 41384 | 34128 |
- spud date: March 1, 2020
- cease drilling: March 8, 2020
- target: middle Bakken
- logging services began at a depth of 8,110' MD at the base of the Tyler formation at 8:00 a.m., March 3, 2020;
- the KOP was reached at 10:15 p.m., March 3, 2020 (14 hours)
- the curve:
- began: March 4, 2020, at 9:00 a.m. CT
- build curve reached TD of 10,947' at 5:30 p.m. CT, March 4, 2020 (8 hours)
- lateral:
- began: 4:15 a.m. CT on March 6, 2020
- center of the ideal target area was located 30' vertical depth inside the middle Bakken formation;
- the overall drilling window has a thickness of 20' inside the middle Bakken formation with the base ending at 40' total vertical feet
- the entire lateral was drilled within the target geological area except 270' that was drilled within one foot of the base target location;
- two collision points deconflicted:
- EN-Labar 154-94-0310H-1
- EN-Labar 154-94-0310H-3
- location for the intersection of the lateral wells are estimated at 8,304' VS for the H-1 and 11,409' VS for the H-3;
- total depth reached at 8:10 p.m. CT on March 8, 2020 (60 hours -- 2.5 days -- wow;
- 14 + 8 + 60 = 7.5 days from start to finish;
- gas levels averaged 388 units with a maximum of 4,024 units
- drill rates averaged 339.90 feet/hour but rounding, about 350 feet/hour, about half-a-mile an hour. Incredible.